Was added to a works panel
The signal
Their words
Kurrabeth Infrastructure has been appointed to the Queensland civil works panel for a term of 5 years.
Why it matters
They're on a government works panel, so jobs will come through it. Get onto their supplier list early.
Where it comes from
- Source: Government contract award
- Document date: 10/09/2026
- Sets the company's rank: Yes
- Checked by hand: Not yet
Kurrabeth Infrastructure
- 17/08/2026Had a major project approved
The Kooramere Flood Levee, proposed by Kurrabeth Infrastructure, has been approved with conditions.
- 10/09/2026Was added to a works panel
Kurrabeth Infrastructure has been appointed to the Queensland civil works panel for a term of 5 years.
Suggested first step The plan names cranes. Lead with your lifting plant and ask for the construction manager. The start date isn't set yet, so get onto their supplier list before the plant is tendered.
People to call about it (2)
Who to speak to at Kurrabeth Infrastructure, decision maker first.
Decision maker
Lachlan Okafor
Project Manager
- l•••••
@ku•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 10/10/2026
Daily user
Liam Delacroix
Site Supervisor
- l•••••
@ku•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 04/10/2026
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this signal
Other signals from Kurrabeth Infrastructure (3)
Each one opens the same way.
Had a major project approved
The Kooramere Flood Levee, proposed by Kurrabeth Infrastructure, has been approved with conditions.
The project has its approval, so construction is next. Get in before the plant is tendered.
Open the sourceNamed cranes and lifting for the job
The construction management plan provides for a 100 tonne mobile crane on site for the structural works.
The plan names cranes for the lifts. Lifting plant is booked early and is hard to find late.
Open the source
Also on record (1)
Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.
Was added to a works panel
Kurrabeth Infrastructure has been appointed to the Queensland minor works panel for a term of 4 years.
They're on a government works panel, so jobs will come through it. Get onto their supplier list early.
Open the source
Prepared by Evidential for Tarrow Plant Hire, a synthetic seller. List of 12/10/2026.