A 14 day major shutdown of the Tunnaby Well processing plant is scheduled for November.

Why it matters

A major shutdown needs crews, parts and rebuilds lined up weeks ahead.

Where it comes from

  • Source: Company announcement
  • Document date: 28/11/2025
  • Sets the company's rank: No
  • Checked by hand: Not yet

Open the source

People to call about it (2)

Who to speak to at Sorrabend Contracting, decision maker first.

  • Decision maker

    Marcus Mwangi

    Maintenance Manager

    Email
    Verified
    Where we found them
    LinkedIn profileChecked 06/10/2026
  • Daily user

    Stefan Rasmussen

    Maintenance Superintendent

    Email
    Verified
    Where we found them
    LinkedIn profileChecked 06/10/2026

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this signal

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Other signals from Sorrabend Contracting (2)

    Each one opens the same way.

    1. 24/09/2026Trade pressSets the rank

      Won added scope at a mine

      Sorrabend Contracting will add 5 haul trucks and two excavators to its fleet at Tunnaby Well under an expanded contract.

      More fleet on site means more machines to repair and keep running.

      Open the source
    2. 05/02/2026Company announcementSets the rank

      Runs ageing plant or fleet

      Much of the haul fleet is more than ten years old.

      The plant or fleet is getting old. Older machines need more repairs and rebuilds.

      Open the source

    Prepared by Evidential for Shaftwell, a synthetic seller. List of 12/10/2026.