Jarnaby Development Corporation
Priority one - next 15The brief
Why now
- 24/09/2026Had a design tender open
Tenders are invited for detailed civil and structural design of the Aquatic Centre Redevelopment, closing 13/11/2026.
- 07/08/2026Buys design through a consultant panel
Jarnaby Development Corporation invites applications to join its panel of engineering design consultants for a term of three years.
Who to speak to
Maeve Lambert, Director Infrastructure Decision maker
- Suggested first step
- They buy through a panel. Ask when it next opens. The tender is open, so get the documents and check the closing date.
Design team
Through a panel
Good to know
- Latest signal: 24/09/2026
- Signals on record: 4
- Owner: State agency
- Project value: $114 million
- Checked by hand: Yes
- Your customer: No
Signals (4)
Each signal comes from a document, with the sentence behind it. Open one to see it with the people to call.
Had a design tender open
Tenders are invited for detailed civil and structural design of the Aquatic Centre Redevelopment, closing 13/11/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceBuys design through a consultant panel
Jarnaby Development Corporation invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the source
Also on record (2)
Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.
Awarded a site investigation contract
Jarnaby Development Corporation awarded a contract for geotechnical investigation and survey for the Aquatic Centre Redevelopment, valued at $240,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceHeld a pre-lodgement meeting for a large site
A pre-lodgement meeting was held with Jarnaby Development Corporation on the Aquatic Centre Redevelopment, ahead of a development application.
They're getting ready to lodge. The engineering reports that go with the application still need writing.
Open the source
People (4)
Who to speak to at Jarnaby Development Corporation, decision maker first.
Decision maker
Maeve Lambert
Director Infrastructure
- m•••••
@ja•••••.com.au Verified - Where we found them
- Company announcementChecked 09/10/2026
Daily user
Aisha Ashdown
Project Manager
- a•••••
@ja•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 10/10/2026
Sponsor
Callum Garrido
Chief Executive Officer
- Where we found them
- Company announcementChecked 07/10/2026
Daily user
Declan Dempsey
Senior Project Engineer
- d•••••
@ja•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 04/10/2026
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this company
Prepared by Evidential for Vessick Partners, a synthetic seller. List of 12/10/2026.