Signals
Everything the companies on the list said that we picked up. Each signal is quoted, dated and linked. Open one to see why it matters and who to call.
All signals
No signals match. Clear the filters
Lodged a project for state approval
The application for the Creek Crossing Bridge Renewal has been accepted and is being assessed by the New South Wales planning department.
The application is in. Assessment brings requests for more studies and design, and someone has to do them.
Open the sourceFunded a project in its capital program
The 2026-27 capital works program includes $100 million for the Creek Crossing Bridge Renewal.
The project is funded. Design has to be let before it can be built.
Open the sourceSaid its engineering team is stretched
Delivery of the program depends on filling vacant engineering positions, and some design will be outsourced.
Their own engineers are short-handed, so more of the design goes out.
Open the sourceWon state or federal funding for a project
Mulgrennan Shire Council will receive $32 million from the state and federal governments towards the Creek Crossing Bridge Renewal.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Creek Crossing Bridge Renewal.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceAwarded a site investigation contract
Mulgrennan Shire Council awarded a contract for geotechnical investigation and survey for the Creek Crossing Bridge Renewal, valued at $310,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Lodged a development application for a large site
Development application for the Town Centre Mixed Use Site. Applicant: Jessamoor Development Corporation. Estimated cost of works: $250 million.
The application is lodged. Civil design for roads, drainage and services follows, and the assessor will ask for more.
Open the sourceWon state or federal funding for a project
Jessamoor Development Corporation will receive $18 million from the state and federal governments towards the Town Centre Mixed Use Site.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceBuys design through a consultant panel
Jessamoor Development Corporation invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceFunded a project in its capital program
Jessamoor Development Corporation: Town Centre Mixed Use Site, estimated total cost $250 million, funded from 2026-27.
The project is funded. Design has to be let before it can be built.
Open the sourceAsked what studies an approval needs
Jessamoor Development Corporation has requested assessment requirements for the Town Centre Mixed Use Site.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Lodged a project for state approval
The application for the Northern Stormwater Upgrade has been accepted and is being assessed by the New South Wales planning department.
The application is in. Assessment brings requests for more studies and design, and someone has to do them.
Open the sourceFunded design in its capital program
Design of the Northern Stormwater Upgrade is funded in the 2026-27 capital works program.
There's money for design in this year's program. The design brief usually goes out within months.
Open the sourceAwarded a site investigation contract
Jolleby Regional Council awarded a contract for geotechnical investigation and survey for the Northern Stormwater Upgrade, valued at $90,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceBuys design through a consultant panel
Jolleby Regional Council invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the source
Lodged a development application for a large site
Development application for the Aquatic Centre Redevelopment. Applicant: Tellaby Development Corporation. Estimated cost of works: $80 million.
The application is lodged. Civil design for roads, drainage and services follows, and the assessor will ask for more.
Open the sourceGave notice of a design tender to come
Tellaby Development Corporation expects to approach the market for design of the Aquatic Centre Redevelopment in January.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceWon state or federal funding for a project
Tellaby Development Corporation will receive $5 million from the state and federal governments towards the Aquatic Centre Redevelopment.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Aquatic Centre Redevelopment.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Aquatic Centre Redevelopment.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Had a design tender open
Rasselby Regional Council invites submissions from engineering consultants for design services for the Town Centre Flood Mitigation Scheme. Submissions close 23/10/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceFunded design in its capital program
Design of the Town Centre Flood Mitigation Scheme is funded in the 2026-27 capital works program.
There's money for design in this year's program. The design brief usually goes out within months.
Open the sourceAwarded a site investigation contract
Rasselby Regional Council awarded a contract for geotechnical investigation and survey for the Town Centre Flood Mitigation Scheme, valued at $540,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Referred a project for environmental approval
The referral covers the Creek Levee Upgrade, a $65 million project with construction proposed to start in 2027.
The project is in approvals now. The studies and design the decision asks for are about to be let.
Open the sourceAwarded a site investigation contract
Frellowin City Council awarded a contract for geotechnical investigation and survey for the Creek Levee Upgrade, valued at $170,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceFunded design in its capital program
Creek Levee Upgrade: $600,000 for detailed design in 2026-27, with construction in later years.
There's money for design in this year's program. The design brief usually goes out within months.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Creek Levee Upgrade.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Gave notice of a design tender to come
Mellingrove Shire Council expects to approach the market for design of the Pump Station Renewal Program in December.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceLodged a development application for a large site
Mellingrove Shire Council has lodged a development application for the Pump Station Renewal Program on a 156 hectare site.
The application is lodged. Civil design for roads, drainage and services follows, and the assessor will ask for more.
Open the sourceSaid its engineering team is stretched
Delivery of the program depends on filling vacant engineering positions, and some design will be outsourced.
Their own engineers are short-handed, so more of the design goes out.
Open the sourceFunded a project in its capital program
The 2026-27 capital works program includes $255 million for the Pump Station Renewal Program.
The project is funded. Design has to be let before it can be built.
Open the source
Had a design tender open
Gollaby Water invites submissions from engineering consultants for design services for the Eastern Reservoir Renewal. Submissions close 23/10/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceFunded a project in its capital program
Gollaby Water: Eastern Reservoir Renewal, estimated total cost $117 million, funded from 2026-27.
The project is funded. Design has to be let before it can be built.
Open the source
Had a design tender open
Tenders are invited for detailed civil and structural design of the Channel Deepening Project, closing 06/11/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceFunded a project in its capital program
The budget includes funding for Brellin Ports to deliver the Channel Deepening Project.
The project is funded. Design has to be let before it can be built.
Open the source
Referred a project for environmental approval
The referral covers the Western Arterial Road Upgrade, a $40 million project with construction proposed to start in 2027.
The project is in approvals now. The studies and design the decision asks for are about to be let.
Open the sourceGave notice of a design tender to come
Fallowin Regional Council expects to approach the market for design of the Western Arterial Road Upgrade in November.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceAsked what studies an approval needs
Fallowin Regional Council has requested assessment requirements for the Western Arterial Road Upgrade.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Had a design tender open
Tenders are invited for detailed civil and structural design of the Pump Station Renewal Program, closing 30/10/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceFunded a project in its capital program
Varrenby Water: Pump Station Renewal Program, estimated total cost $159 million, funded from 2026-27.
The project is funded. Design has to be let before it can be built.
Open the sourceAwarded a site investigation contract
Varrenby Water awarded a contract for geotechnical investigation and survey for the Pump Station Renewal Program, valued at $360,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceDesigns in house
Design of the Pump Station Renewal Program will be delivered by Varrenby Water's own engineering team.
They design most of their work in house, so less of it goes out.
Open the sourceHad a studies or advisory tender open
Varrenby Water seeks a consultant for geotechnical investigation and concept design of the Pump Station Renewal Program.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceAwarded a site investigation contract
Varrenby Water awarded a contract for geotechnical investigation and survey for the Pump Station Renewal Program, valued at $190,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Had a studies or advisory tender open
Zennowby City Council seeks a consultant for geotechnical investigation and concept design of the Aquatic Centre Redevelopment.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceSaid its engineering team is stretched
Delivery of the program depends on filling vacant engineering positions, and some design will be outsourced.
Their own engineers are short-handed, so more of the design goes out.
Open the source
Had a design tender open
Tenders are invited for detailed civil and structural design of the Aquatic Centre Redevelopment, closing 13/11/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceBuys design through a consultant panel
Jarnaby Development Corporation invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceAwarded a site investigation contract
Jarnaby Development Corporation awarded a contract for geotechnical investigation and survey for the Aquatic Centre Redevelopment, valued at $240,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceHeld a pre-lodgement meeting for a large site
A pre-lodgement meeting was held with Jarnaby Development Corporation on the Aquatic Centre Redevelopment, ahead of a development application.
They're getting ready to lodge. The engineering reports that go with the application still need writing.
Open the source
Won state or federal funding for a project
Cassowin Shire Council will receive $9 million from the state and federal governments towards the Town Centre Flood Mitigation Scheme.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceReferred a project for environmental approval
The referral covers the Town Centre Flood Mitigation Scheme, a $54 million project with construction proposed to start in 2027.
The project is in approvals now. The studies and design the decision asks for are about to be let.
Open the sourceFunded a project in its capital program
Council has adopted a capital works program that funds the Town Centre Flood Mitigation Scheme.
The project is funded. Design has to be let before it can be built.
Open the sourceAwarded a site investigation contract
Cassowin Shire Council awarded a contract for geotechnical investigation and survey for the Town Centre Flood Mitigation Scheme, valued at $340,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceAsked what studies an approval needs
Cassowin Shire Council has requested assessment requirements for the Town Centre Flood Mitigation Scheme.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Had a design tender open
Brodderick Shire Council invites submissions from engineering consultants for design services for the Creek Levee Upgrade. Submissions close 13/11/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceFunded a project in its capital program
The 2026-27 capital works program includes $71 million for the Creek Levee Upgrade.
The project is funded. Design has to be let before it can be built.
Open the sourceSaid a project is not yet fully funded
Construction of the Creek Levee Upgrade remains subject to securing the balance of funding.
Part of the money is still to be found. Detailed design may wait on it.
Open the sourceHad a studies or advisory tender open
Brodderick Shire Council seeks a consultant for geotechnical investigation and concept design of the Creek Levee Upgrade.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceAsked what studies an approval needs
Brodderick Shire Council has requested assessment requirements for the Creek Levee Upgrade.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Lodged a development application for a large site
Nestlow City Council has lodged a development application for the Southern Detention Basin on a 45 hectare site.
The application is lodged. Civil design for roads, drainage and services follows, and the assessor will ask for more.
Open the sourceAsked what studies an approval needs
Nestlow City Council has requested assessment requirements for the Southern Detention Basin.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Lodged a development application for a large site
Development application for the Hilltop Mixed Use Precinct. Applicant: Collowin Property Group. Estimated cost of works: $289 million.
The application is lodged. Civil design for roads, drainage and services follows, and the assessor will ask for more.
Open the sourceHeld a pre-lodgement meeting for a large site
A pre-lodgement meeting was held with Collowin Property Group on the Hilltop Mixed Use Precinct, ahead of a development application.
They're getting ready to lodge. The engineering reports that go with the application still need writing.
Open the source
Lodged a development application for a large site
Zellowmere Property Group has lodged a development application for the Northern Growth Area Subdivision on a 59 hectare site.
The application is lodged. Civil design for roads, drainage and services follows, and the assessor will ask for more.
Open the source
Had a design tender open
Tenders are invited for detailed civil and structural design of the Southern Trunk Main Duplication, closing 30/10/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceDesigns in house
Design of the Southern Trunk Main Duplication will be delivered by Pillowbrae Water's own engineering team.
They design most of their work in house, so less of it goes out.
Open the sourceAsked what studies an approval needs
Pillowbrae Water has requested assessment requirements for the Southern Trunk Main Duplication.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Had a design tender open
Wraxendale Power invites submissions from engineering consultants for design services for the Wind Farm Connection. Submissions close 06/11/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceDesigns in house
Design of the Wind Farm Connection will be delivered by Wraxendale Power's own engineering team.
They design most of their work in house, so less of it goes out.
Open the sourceAwarded a site investigation contract
Wraxendale Power awarded a contract for geotechnical investigation and survey for the Wind Farm Connection, valued at $190,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Lodged a project for state approval
Kibbleworth Property Group has lodged an application for the Riverside Residential Estate for assessment as a major project.
The application is in. Assessment brings requests for more studies and design, and someone has to do them.
Open the sourceHeld a pre-lodgement meeting for a large site
A pre-lodgement meeting was held with Kibbleworth Property Group on the Riverside Residential Estate, ahead of a development application.
They're getting ready to lodge. The engineering reports that go with the application still need writing.
Open the source
Referred a project for environmental approval
Fennaroo Resources has referred the Rail Loop and Load Out for a decision on whether it needs assessment under federal environment law.
The project is in approvals now. The studies and design the decision asks for are about to be let.
Open the sourceAsked what studies an approval needs
Fennaroo Resources has requested assessment requirements for the Rail Loop and Load Out.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Referred a project for environmental approval
The referral covers the Tailings Storage Facility Expansion, a $42 million project with construction proposed to start in 2027.
The project is in approvals now. The studies and design the decision asks for are about to be let.
Open the sourceAsked what studies an approval needs
Parrowmere Mining has requested assessment requirements for the Tailings Storage Facility Expansion.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Lodged a development application for a large site
Vellandra Developments has lodged a development application for the Hilltop Mixed Use Precinct on a 45 hectare site.
The application is lodged. Civil design for roads, drainage and services follows, and the assessor will ask for more.
Open the sourceAsked what studies an approval needs
Vellandra Developments has requested assessment requirements for the Hilltop Mixed Use Precinct.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Gave notice of a design tender to come
Cullendrew Regional Council expects to approach the market for design of the Riverside Bridge Replacement in November.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceFunded design in its capital program
Design of the Riverside Bridge Replacement is funded in the 2026-27 capital works program.
There's money for design in this year's program. The design brief usually goes out within months.
Open the sourceWon state or federal funding for a project
Cullendrew Regional Council will receive $32 million from the state and federal governments towards the Riverside Bridge Replacement.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Riverside Bridge Replacement.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Gave notice of a design tender to come
Ostlebury Water expects to approach the market for design of the Sewage Treatment Plant Augmentation in January.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceAwarded a site investigation contract
Ostlebury Water awarded a contract for geotechnical investigation and survey for the Sewage Treatment Plant Augmentation, valued at $480,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceFunded a project in its capital program
The budget includes funding for Ostlebury Water to deliver the Sewage Treatment Plant Augmentation.
The project is funded. Design has to be let before it can be built.
Open the sourceBuys design through a consultant panel
Ostlebury Water invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceWon state or federal funding for a project
Ostlebury Water will receive $35 million from the state and federal governments towards the Sewage Treatment Plant Augmentation.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceAsked what studies an approval needs
Ostlebury Water has requested assessment requirements for the Sewage Treatment Plant Augmentation.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Gave notice of a design tender to come
Cadderow Regional Council expects to approach the market for design of the Creek Levee Upgrade in November.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceFunded design in its capital program
Creek Levee Upgrade: $200,000 for detailed design in 2026-27, with construction in later years.
There's money for design in this year's program. The design brief usually goes out within months.
Open the sourceSaid design will be let to consultants
Detailed design of the Creek Levee Upgrade will be carried out by external consultants.
They've said the design will go to consultants. That's the work you sell.
Open the sourceAsked what studies an approval needs
Cadderow Regional Council has requested assessment requirements for the Creek Levee Upgrade.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Funded design in its capital program
The 2026-27 budget provides $20 million for planning and design of the Northern Trunk Sewer Upgrade, delivered by Yallendor Water.
There's money for planning and design in this year's budget. The design brief usually goes out within months.
Open the sourceAwarded a site investigation contract
Yallendor Water awarded a contract for geotechnical investigation and survey for the Northern Trunk Sewer Upgrade, valued at $330,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceWon state or federal funding for a project
Yallendor Water will receive $29 million from the state and federal governments towards the Northern Trunk Sewer Upgrade.
Outside money comes with a date to spend it by, so design has to start soon.
Open the source
Funded design in its capital program
Design of the Ring Road Intersection Upgrade is funded in the 2026-27 capital works program.
There's money for design in this year's program. The design brief usually goes out within months.
Open the sourceAwarded a site investigation contract
Pemberow Regional Council awarded a contract for geotechnical investigation and survey for the Ring Road Intersection Upgrade, valued at $150,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceWon state or federal funding for a project
Pemberow Regional Council will receive $4 million from the state and federal governments towards the Ring Road Intersection Upgrade.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceHad a studies or advisory tender open
Pemberow Regional Council seeks a consultant for geotechnical investigation and concept design of the Ring Road Intersection Upgrade.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceHad a studies or advisory tender open
Pemberow Regional Council seeks a consultant for geotechnical investigation and concept design of the Ring Road Intersection Upgrade.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Won state or federal funding for a project
Elverick Water will receive $35 million from the state and federal governments towards the Western Water Treatment Plant Upgrade.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceFunded design in its capital program
The 2026-27 budget provides $10 million for planning and design of the Western Water Treatment Plant Upgrade, delivered by Elverick Water.
There's money for planning and design in this year's budget. The design brief usually goes out within months.
Open the sourceAwarded a site investigation contract
Elverick Water awarded a contract for geotechnical investigation and survey for the Western Water Treatment Plant Upgrade, valued at $210,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceAsked what studies an approval needs
Elverick Water has requested assessment requirements for the Western Water Treatment Plant Upgrade.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Western Water Treatment Plant Upgrade.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Funded design in its capital program
Design of the Northern Stormwater Upgrade is funded in the 2026-27 capital works program.
There's money for design in this year's program. The design brief usually goes out within months.
Open the sourceWon state or federal funding for a project
Wexmoor Regional Council will receive $18 million from the state and federal governments towards the Northern Stormwater Upgrade.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceBuys design through a consultant panel
Wexmoor Regional Council invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceHad a studies or advisory tender open
Wexmoor Regional Council seeks a consultant for geotechnical investigation and concept design of the Northern Stormwater Upgrade.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Funded design in its capital program
The 2026-27 budget provides $6 million for planning and design of the Sewage Treatment Plant Augmentation, delivered by Iskerby Water.
There's money for planning and design in this year's budget. The design brief usually goes out within months.
Open the sourceWon state or federal funding for a project
Iskerby Water will receive $26 million from the state and federal governments towards the Sewage Treatment Plant Augmentation.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceAwarded a site investigation contract
Iskerby Water awarded a contract for geotechnical investigation and survey for the Sewage Treatment Plant Augmentation, valued at $440,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Sewage Treatment Plant Augmentation.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Sewage Treatment Plant Augmentation.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Funded a project in its capital program
The budget includes funding for Hessington Power to deliver the Solar Farm and Substation.
The project is funded. Design has to be let before it can be built.
Open the sourceGave notice of a design tender to come
Hessington Power expects to approach the market for design of the Solar Farm and Substation in January.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceWon state or federal funding for a project
Hessington Power will receive $27 million from the state and federal governments towards the Solar Farm and Substation.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceAwarded a site investigation contract
Hessington Power awarded a contract for geotechnical investigation and survey for the Solar Farm and Substation, valued at $300,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Won state or federal funding for a project
Sturrowin Water will receive $16 million from the state and federal governments towards the Sewage Treatment Plant Augmentation.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceFunded design in its capital program
The 2026-27 budget provides $17 million for planning and design of the Sewage Treatment Plant Augmentation, delivered by Sturrowin Water.
There's money for planning and design in this year's budget. The design brief usually goes out within months.
Open the sourceBuys design through a consultant panel
Sturrowin Water invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the source
Gave notice of a design tender to come
Lambrewin Regional Council expects to approach the market for design of the Western Water Treatment Plant Upgrade in January.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceFunded design in its capital program
Western Water Treatment Plant Upgrade: $200,000 for detailed design in 2026-27, with construction in later years.
There's money for design in this year's program. The design brief usually goes out within months.
Open the source
Gave notice of a design tender to come
Oppaway Water expects to approach the market for design of the Eastern Reservoir Renewal in November.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceFunded design in its capital program
The 2026-27 budget provides $13 million for planning and design of the Eastern Reservoir Renewal, delivered by Oppaway Water.
There's money for planning and design in this year's budget. The design brief usually goes out within months.
Open the source
Gave notice of a design tender to come
Marrowbend Water expects to approach the market for design of the Pump Station Renewal Program in January.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceBuys design through a consultant panel
Marrowbend Water invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceFunded design in its capital program
The 2026-27 budget provides $7 million for planning and design of the Pump Station Renewal Program, delivered by Marrowbend Water.
There's money for planning and design in this year's budget. The design brief usually goes out within months.
Open the sourceAwarded a site investigation contract
Marrowbend Water awarded a contract for geotechnical investigation and survey for the Pump Station Renewal Program, valued at $160,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Gave notice of a design tender to come
Gurrowby City Council expects to approach the market for design of the Western Arterial Road Upgrade in January.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceAwarded a site investigation contract
Gurrowby City Council awarded a contract for geotechnical investigation and survey for the Western Arterial Road Upgrade, valued at $390,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceFunded a project in its capital program
Council has adopted a capital works program that funds the Western Arterial Road Upgrade.
The project is funded. Design has to be let before it can be built.
Open the sourceHad a studies or advisory tender open
Gurrowby City Council seeks a consultant for geotechnical investigation and concept design of the Western Arterial Road Upgrade.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceAsked what studies an approval needs
Gurrowby City Council has requested assessment requirements for the Western Arterial Road Upgrade.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Won state or federal funding for a project
Abbrewick Ports will receive $14 million from the state and federal governments towards the Wharf Extension.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceFunded a project in its capital program
Abbrewick Ports: Wharf Extension, estimated total cost $345 million, funded from 2026-27.
The project is funded. Design has to be let before it can be built.
Open the sourceBuys design through a consultant panel
Abbrewick Ports invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceAsked what studies an approval needs
Abbrewick Ports has requested assessment requirements for the Wharf Extension.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Funded a project in its capital program
The budget includes funding for Burrenby Development Corporation to deliver the Emergency Services Precinct.
The project is funded. Design has to be let before it can be built.
Open the sourceAwarded a site investigation contract
Burrenby Development Corporation awarded a contract for geotechnical investigation and survey for the Emergency Services Precinct, valued at $280,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceWon state or federal funding for a project
Burrenby Development Corporation will receive $12 million from the state and federal governments towards the Emergency Services Precinct.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceAsked what studies an approval needs
Burrenby Development Corporation has requested assessment requirements for the Emergency Services Precinct.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Gave notice of a design tender to come
Glennaby Water expects to approach the market for design of the Recycled Water Scheme in December.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceWon state or federal funding for a project
Glennaby Water will receive $36 million from the state and federal governments towards the Recycled Water Scheme.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceFunded a project in its capital program
The budget includes funding for Glennaby Water to deliver the Recycled Water Scheme.
The project is funded. Design has to be let before it can be built.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Recycled Water Scheme.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Funded a project in its capital program
The 2026-27 capital works program includes $156 million for the Recycled Water Scheme.
The project is funded. Design has to be let before it can be built.
Open the sourceGave notice of a design tender to come
Sallowin Shire Council expects to approach the market for design of the Recycled Water Scheme in November.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceAwarded a site investigation contract
Sallowin Shire Council awarded a contract for geotechnical investigation and survey for the Recycled Water Scheme, valued at $280,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceBuys design through a consultant panel
Sallowin Shire Council invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceAsked what studies an approval needs
Sallowin Shire Council has requested assessment requirements for the Recycled Water Scheme.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Funded design in its capital program
The 2026-27 budget provides $12 million for planning and design of the Wind Farm Connection, delivered by Kessendine Power.
There's money for planning and design in this year's budget. The design brief usually goes out within months.
Open the sourceBuys design through a consultant panel
Kessendine Power invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the source
Gave notice of a design tender to come
Yarlowin Shire Council expects to approach the market for design of the Recycled Water Scheme in November.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceSaid its engineering team is stretched
Delivery of the program depends on filling vacant engineering positions, and some design will be outsourced.
Their own engineers are short-handed, so more of the design goes out.
Open the sourceFunded a project in its capital program
Council has adopted a capital works program that funds the Recycled Water Scheme.
The project is funded. Design has to be let before it can be built.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Recycled Water Scheme.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceHad a studies or advisory tender open
Yarlowin Shire Council seeks a consultant for geotechnical investigation and concept design of the Recycled Water Scheme.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Gave notice of a design tender to come
Dabberley Development Corporation expects to approach the market for design of the Riverside Residential Estate in November.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceFunded a project in its capital program
The budget includes funding for Dabberley Development Corporation to deliver the Riverside Residential Estate.
The project is funded. Design has to be let before it can be built.
Open the sourceBuys design through a consultant panel
Dabberley Development Corporation invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the source
Ettaby Energy
Priority twoFunded design in its capital program
The 2026-27 budget provides $14 million for planning and design of the Zone Substation Upgrade, delivered by Ettaby Energy.
There's money for planning and design in this year's budget. The design brief usually goes out within months.
Open the sourceBuys design through a consultant panel
Ettaby Energy invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the source
Yennamoor Regional Council
Priority twoGave notice of a design tender to come
Yennamoor Regional Council expects to approach the market for design of the Creek Levee Upgrade in November.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceFunded a project in its capital program
Council has adopted a capital works program that funds the Creek Levee Upgrade.
The project is funded. Design has to be let before it can be built.
Open the sourceBuys design through a consultant panel
Yennamoor Regional Council invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceHad a studies or advisory tender open
Yennamoor Regional Council seeks a consultant for geotechnical investigation and concept design of the Creek Levee Upgrade.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Norrabeck Regional Council
Priority twoSaid its engineering team is stretched
Delivery of the program depends on filling vacant engineering positions, and some design will be outsourced.
Their own engineers are short-handed, so more of the design goes out.
Open the sourceFunded a project in its capital program
Council has adopted a capital works program that funds the Freight Route Upgrade.
The project is funded. Design has to be let before it can be built.
Open the sourceAsked what studies an approval needs
Norrabeck Regional Council has requested assessment requirements for the Freight Route Upgrade.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the sourceAwarded a site investigation contract
Norrabeck Regional Council awarded a contract for geotechnical investigation and survey for the Freight Route Upgrade, valued at $150,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Gessendale Water
Priority twoAwarded a site investigation contract
Gessendale Water awarded a contract for geotechnical investigation and survey for the Recycled Water Scheme, valued at $150,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceFunded a project in its capital program
Gessendale Water: Recycled Water Scheme, estimated total cost $213 million, funded from 2026-27.
The project is funded. Design has to be let before it can be built.
Open the sourceBuys design through a consultant panel
Gessendale Water invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Recycled Water Scheme.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Allambrook Regional Council
Priority twoGave notice of a design tender to come
Allambrook Regional Council expects to approach the market for design of the Freight Route Upgrade in January.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceFunded a project in its capital program
Council has adopted a capital works program that funds the Freight Route Upgrade.
The project is funded. Design has to be let before it can be built.
Open the source
Ulvery City Council
Priority twoFunded a project in its capital program
Council has adopted a capital works program that funds the Low Level Crossing Flood Upgrade.
The project is funded. Design has to be let before it can be built.
Open the sourceSaid its engineering team is stretched
Delivery of the program depends on filling vacant engineering positions, and some design will be outsourced.
Their own engineers are short-handed, so more of the design goes out.
Open the source
Nurrabee Regional Council
Priority twoGave notice of a design tender to come
Nurrabee Regional Council expects to approach the market for design of the Low Level Crossing Flood Upgrade in December.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceFunded a project in its capital program
The 2026-27 capital works program includes $61 million for the Low Level Crossing Flood Upgrade.
The project is funded. Design has to be let before it can be built.
Open the source
Ollenby Water
Priority twoFunded a project in its capital program
The budget includes funding for Ollenby Water to deliver the Northern Trunk Sewer Upgrade.
The project is funded. Design has to be let before it can be built.
Open the sourceWon state or federal funding for a project
Ollenby Water will receive $29 million from the state and federal governments towards the Northern Trunk Sewer Upgrade.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceAwarded a site investigation contract
Ollenby Water awarded a contract for geotechnical investigation and survey for the Northern Trunk Sewer Upgrade, valued at $230,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceAsked what studies an approval needs
Ollenby Water has requested assessment requirements for the Northern Trunk Sewer Upgrade.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Vallowin City Council
Priority twoAwarded a site investigation contract
Vallowin City Council awarded a contract for geotechnical investigation and survey for the Riverside Drainage Renewal, valued at $220,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceFunded a project in its capital program
Council has adopted a capital works program that funds the Riverside Drainage Renewal.
The project is funded. Design has to be let before it can be built.
Open the sourceAwarded a site investigation contract
Vallowin City Council awarded a contract for geotechnical investigation and survey for the Riverside Drainage Renewal, valued at $130,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Hobrennan Energy
Priority twoGave notice of a design tender to come
Hobrennan Energy expects to approach the market for design of the Transmission Line Upgrade in November.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceFunded a project in its capital program
Hobrennan Energy: Transmission Line Upgrade, estimated total cost $156 million, funded from 2026-27.
The project is funded. Design has to be let before it can be built.
Open the sourceAwarded a site investigation contract
Hobrennan Energy awarded a contract for geotechnical investigation and survey for the Transmission Line Upgrade, valued at $560,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceDesigns in house
Design of the Transmission Line Upgrade will be delivered by Hobrennan Energy's own engineering team.
They design most of their work in house, so less of it goes out.
Open the source
Pudderby Shire Council
Priority twoBuys design through a consultant panel
Pudderby Shire Council invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceFunded design in its capital program
Sewage Treatment Plant Augmentation: $300,000 for detailed design in 2026-27, with construction in later years.
There's money for design in this year's program. The design brief usually goes out within months.
Open the sourceAwarded a site investigation contract
Pudderby Shire Council awarded a contract for geotechnical investigation and survey for the Sewage Treatment Plant Augmentation, valued at $550,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceAsked what studies an approval needs
Pudderby Shire Council has requested assessment requirements for the Sewage Treatment Plant Augmentation.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the source
Lessowby Ports
Priority twoFunded a project in its capital program
The budget includes funding for Lessowby Ports to deliver the Breakwater Renewal.
The project is funded. Design has to be let before it can be built.
Open the sourceWon state or federal funding for a project
Lessowby Ports will receive $23 million from the state and federal governments towards the Breakwater Renewal.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceDesigns in house
Design of the Breakwater Renewal will be delivered by Lessowby Ports's own engineering team.
They design most of their work in house, so less of it goes out.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Breakwater Renewal.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Rennaby Water
Priority twoFunded a project in its capital program
The budget includes funding for Rennaby Water to deliver the Southern Trunk Main Duplication.
The project is funded. Design has to be let before it can be built.
Open the sourceWon state or federal funding for a project
Rennaby Water will receive $7 million from the state and federal governments towards the Southern Trunk Main Duplication.
Outside money comes with a date to spend it by, so design has to start soon.
Open the sourceDesigns in house
Design of the Southern Trunk Main Duplication will be delivered by Rennaby Water's own engineering team.
They design most of their work in house, so less of it goes out.
Open the source
Hallendry City Council
Priority twoSaid design will be let to consultants
Detailed design of the Southern Trunk Main Duplication will be carried out by external consultants.
They've said the design will go to consultants. That's the work you sell.
Open the sourceFunded a project in its capital program
Council has adopted a capital works program that funds the Southern Trunk Main Duplication.
The project is funded. Design has to be let before it can be built.
Open the sourceAwarded a site investigation contract
Hallendry City Council awarded a contract for geotechnical investigation and survey for the Southern Trunk Main Duplication, valued at $220,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Tullowmere Energy
Priority twoFunded a project in its capital program
The budget includes funding for Tullowmere Energy to deliver the Transmission Line Upgrade.
The project is funded. Design has to be let before it can be built.
Open the source
Esselmoor Water
Priority twoFunded design in its capital program
The 2026-27 budget provides $16 million for planning and design of the Western Water Treatment Plant Upgrade, delivered by Esselmoor Water.
There's money for planning and design in this year's budget. The design brief usually goes out within months.
Open the sourceDesigns in house
Design of the Western Water Treatment Plant Upgrade will be delivered by Esselmoor Water's own engineering team.
They design most of their work in house, so less of it goes out.
Open the source
Innaroo City Council
Priority twoFunded a project in its capital program
Council has adopted a capital works program that funds the Aquatic Centre Redevelopment.
The project is funded. Design has to be let before it can be built.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Aquatic Centre Redevelopment.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Aquatic Centre Redevelopment.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Lornabee Ports
Priority twoFunded a project in its capital program
The budget includes funding for Lornabee Ports to deliver the Wharf Extension.
The project is funded. Design has to be let before it can be built.
Open the source
Kollinbrae Water
Priority twoAwarded a site investigation contract
Kollinbrae Water awarded a contract for geotechnical investigation and survey for the Pump Station Renewal Program, valued at $390,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceFunded a project in its capital program
The budget includes funding for Kollinbrae Water to deliver the Pump Station Renewal Program.
The project is funded. Design has to be let before it can be built.
Open the sourceHad a studies or advisory tender open
Kollinbrae Water seeks a consultant for geotechnical investigation and concept design of the Pump Station Renewal Program.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Kelderby Power
Priority twoDesigns in house
Design of the Zone Substation Upgrade will be delivered by Kelderby Power's own engineering team.
They design most of their work in house, so less of it goes out.
Open the sourceFunded design in its capital program
The 2026-27 budget provides $7 million for planning and design of the Zone Substation Upgrade, delivered by Kelderby Power.
There's money for planning and design in this year's budget. The design brief usually goes out within months.
Open the sourceAwarded a site investigation contract
Kelderby Power awarded a contract for geotechnical investigation and survey for the Zone Substation Upgrade, valued at $110,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Zone Substation Upgrade.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Quennaby Energy
Priority twoFunded a project in its capital program
The budget includes funding for Quennaby Energy to deliver the Grid Battery Project.
The project is funded. Design has to be let before it can be built.
Open the sourceAwarded a site investigation contract
Quennaby Energy awarded a contract for geotechnical investigation and survey for the Grid Battery Project, valued at $460,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceDesigns in house
Design of the Grid Battery Project will be delivered by Quennaby Energy's own engineering team.
They design most of their work in house, so less of it goes out.
Open the sourceAsked what studies an approval needs
Quennaby Energy has requested assessment requirements for the Grid Battery Project.
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Open the sourceAwarded a site investigation contract
Quennaby Energy awarded a contract for geotechnical investigation and survey for the Grid Battery Project, valued at $200,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Bannerow Water
Priority twoFunded a project in its capital program
Bannerow Water: Pump Station Renewal Program, estimated total cost $62 million, funded from 2026-27.
The project is funded. Design has to be let before it can be built.
Open the sourceDesigns in house
Design of the Pump Station Renewal Program will be delivered by Bannerow Water's own engineering team.
They design most of their work in house, so less of it goes out.
Open the sourceAwarded a site investigation contract
Bannerow Water awarded a contract for geotechnical investigation and survey for the Pump Station Renewal Program, valued at $300,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceHad a studies or advisory tender open
Bannerow Water seeks a consultant for geotechnical investigation and concept design of the Pump Station Renewal Program.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Wimbrenna Water
Priority twoBuys design through a consultant panel
Wimbrenna Water invites applications to join its panel of engineering design consultants for a term of three years.
They buy design from a panel. Being on it is the way in.
Open the sourceFunded a project in its capital program
The budget includes funding for Wimbrenna Water to deliver the Recycled Water Scheme.
The project is funded. Design has to be let before it can be built.
Open the sourceHad a studies or advisory tender open
Quotations are sought from engineering consultants for a feasibility and options study for the Recycled Water Scheme.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the source
Dellmoor Ports
Priority twoGave notice of a design tender to come
Dellmoor Ports expects to approach the market for design of the Bulk Berth Upgrade in December.
A design tender is on its way. There's time to meet them before it goes out.
Open the sourceFunded a project in its capital program
The budget includes funding for Dellmoor Ports to deliver the Bulk Berth Upgrade.
The project is funded. Design has to be let before it can be built.
Open the sourceDesigns in house
Design of the Bulk Berth Upgrade will be delivered by Dellmoor Ports's own engineering team.
They design most of their work in house, so less of it goes out.
Open the source
Tessaby Energy
Priority twoFunded a project in its capital program
The budget includes funding for Tessaby Energy to deliver the Wind Farm Connection.
The project is funded. Design has to be let before it can be built.
Open the sourceDesigns in house
Design of the Wind Farm Connection will be delivered by Tessaby Energy's own engineering team.
They design most of their work in house, so less of it goes out.
Open the sourceAwarded a site investigation contract
Tessaby Energy awarded a contract for geotechnical investigation and survey for the Wind Farm Connection, valued at $310,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Derrabin Development Corporation
Priority twoFunded a project in its capital program
The budget includes funding for Derrabin Development Corporation to deliver the Works Depot Consolidation.
The project is funded. Design has to be let before it can be built.
Open the sourceDesigns in house
Design of the Works Depot Consolidation will be delivered by Derrabin Development Corporation's own engineering team.
They design most of their work in house, so less of it goes out.
Open the source
Showing 25 of 241Show 25 more
Prepared by Evidential for Vessick Partners, a synthetic seller. List of 12/10/2026.