How this list is built
This page walks through the method from start to finish. It shows how a project owner gets on the list and why it ranks where it does.
1. What the list is for
The list finds project owners with a project that needs civil or structural design, studies or approvals work, before that work is let:
- It is built from what each owner has published, in its own words.
- Every claim on it carries a quote, the date of the document and a link to the source.
- Nothing is inferred from an owner's size, sector or web traffic.
If you can't trace a line back to a document, tell us and we'll take it out.
2. Where the owners come from
The starting point is every owner that builds infrastructure we can name:
- Councils, water and energy utilities, port authorities and state agencies, from their own published programs.
- Developers, from the planning registers where they lodge large sites.
- Resources companies, from the federal and state approvals registers.
- Your clients are taken off once we have your client list.
That leaves the owners with design work still to let.
3. What we read
Everything we read is a public document:
- Tender notices and contract award notices - on the federal and state tender portals.
- Environmental referrals and major projects registers - projects lodged for approval.
- Development applications - large sites on council and state planning registers.
- Council capital works programs and state budget papers - what is funded, and when.
We keep a copy of each document, so a signal can always be checked against the page it came from.
4. The questions we ask
We ask the same fixed set of questions of every document. Each question has a fixed set of possible answers:
- Is a design, studies or advisory tender open, or about to be?
- Has a project been referred or lodged for approval, or a development application lodged?
- Is the project in this year's capital program, for design or for delivery?
- Has a site investigation been let, or outside funding won?
- How does the owner buy design - through consultants, a panel, or its own engineers?
- Has a design consultant already been appointed?
Where a document doesn't answer a question, we record nothing. We never fill a gap with a guess.
5. What a signal is
A signal is an answer that matters to you, with the evidence attached:
- What they said - the answer in plain words, for example "Had a design tender open".
- Their words - the sentence from the document, quoted as written.
- Document date - the date on the document itself. This is not the date we read it.
- Source - a link to the document.
- Why it matters - one line on what the signal means for a design firm.
An answer with no quote behind it is never shown.
6. How an owner gets on the list
An owner has to pass one of two tests. There is no cap on how many can pass:
- Priority one - a project lodged for approval, or a design or studies tender open now.
- Priority two - a project funded in a capital program, with design not yet awarded.
An owner that passes neither test is not on the list, however many signals it has.
7. How the list is ranked
Priority one comes first, then priority two carries on the numbering. The strongest signal sets the rank and everything else adds to it:
- A tender open now or a project lodged for approval ranks first, then design funded this year, then a funded project.
- A signal counts in full for 30 days, then counts for less as it ages. A tender counts for 60 days, a capital program for a year.
- Outside funding with a date to spend it by lifts an owner.
- Saying design will go to consultants, or that its engineers are stretched, lifts an owner.
- Another firm already appointed, or design done in house, lowers an owner. It never removes one.
You won't see a number for how strong an owner is. You'll see the rank and the signals that set it, marked "Sets the rank".
8. How it is checked
Before a list reaches you, we read the signals that set each rank against their source documents:
- A signal that is wrong comes out, and the owner is ranked again without it.
- An owner can leave the list on that check.
- Each owner shows whether it has been checked by hand, and so does each signal.
- Other signals on record are shown too. Most of those have not been checked by hand, and each one says so.
One fault to watch for - a project delivered by a state agency can be read as the council's own.
9. The people
For each owner we look for the people worth calling, decision maker first:
- Decision maker - the director of infrastructure or the manager of capital works, the project director at a developer.
- Daily user - the project manager or design manager who writes the brief and runs the consultant.
- Sponsor - the chief executive or general manager.
- Names come from the owner's own documents and from LinkedIn. Each person links to where we found them.
- An email is only shown once it has been verified. If it sits on another domain, it says so.
- A mobile number is looked up only when you ask for one.
Titles change, and councils restructure. Check the profile before you call.
10. How the list changes
The list is rebuilt from new documents, and each update is recorded:
- The Changelog shows every update, with the owners that joined, left or moved, and why.
- Your stars and notes stay with their owner, signal or person through an update.
- A record that leaves the list keeps its notes. They show as "no longer on the list".
Tell us what's wrong or missing and it goes into the next update.
Where the data stops
A few limits to keep in mind before you pick up the phone:
- A document date can be weeks old. A tender may have closed since.
- Some tenders go only to a panel and are never published. We can't see those.
- Private owners publish far less than public ones, so most of them reach the list through approvals.
- We read what is published. A project an owner has not announced will not be here.
Words you don't know, and how-tos for this site, are in the FAQ.
Prepared by Evidential for Vessick Partners, a synthetic seller. List of 12/10/2026.