Vessick Partners

The signal

Their words

Design of the Pump Station Renewal Program will be delivered by Bannerow Water's own engineering team.

Why it matters

They design most of their work in house, so less of it goes out.

Where it comes from

  • Source: State budget paper
  • Document date: 04/09/2026
  • Sets the company's rank: Yes
  • Checked by hand: Not yet

Open the source

People to call about it (0)

No one listed for this company yet.

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this signal

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Other signals from Bannerow Water (3)

    Each one opens the same way.

    1. 05/10/2026State budget paperSets the rank

      Funded a project in its capital program

      Bannerow Water: Pump Station Renewal Program, estimated total cost $62 million, funded from 2026-27.

      The project is funded. Design has to be let before it can be built.

      Open the source
    2. 31/07/2026Contract award noticeSets the rank

      Awarded a site investigation contract

      Bannerow Water awarded a contract for geotechnical investigation and survey for the Pump Station Renewal Program, valued at $300,000.

      Survey or geotechnical work has been let. Design usually comes next.

      Open the source

    Also on record (1)

    Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.

    1. 13/03/2026Tender notice

      Had a studies or advisory tender open

      Bannerow Water seeks a consultant for geotechnical investigation and concept design of the Pump Station Renewal Program.

      They're buying the studies that come before design. The firm that does them is well placed for the design.

      Open the source

    Prepared by Evidential for Vessick Partners, a synthetic seller. List of 12/10/2026.