Design of the Transmission Line Upgrade will be delivered by Hobrennan Energy's own engineering team.

Why it matters

They design most of their work in house, so less of it goes out.

Where it comes from

  • Source: State budget paper
  • Document date: 12/06/2026
  • Sets the company's rank: Yes
  • Checked by hand: Not yet

Open the source

People to call about it (0)

No one listed for this company yet.

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this signal

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Other signals from Hobrennan Energy (3)

    Each one opens the same way.

    1. 02/10/2026Tender noticeSets the rank

      Gave notice of a design tender to come

      Hobrennan Energy expects to approach the market for design of the Transmission Line Upgrade in November.

      A design tender is on its way. There's time to meet them before it goes out.

      Open the source
    2. 16/09/2026State budget paperSets the rank

      Funded a project in its capital program

      Hobrennan Energy: Transmission Line Upgrade, estimated total cost $156 million, funded from 2026-27.

      The project is funded. Design has to be let before it can be built.

      Open the source
    3. 19/08/2026Contract award noticeSets the rank

      Awarded a site investigation contract

      Hobrennan Energy awarded a contract for geotechnical investigation and survey for the Transmission Line Upgrade, valued at $560,000.

      Survey or geotechnical work has been let. Design usually comes next.

      Open the source