Lessowby Ports will receive $23 million from the state and federal governments towards the Breakwater Renewal.

Why it matters

Outside money comes with a date to spend it by, so design has to start soon.

Where it comes from

  • Source: State budget paper
  • Document date: 21/09/2026
  • Sets the company's rank: Yes
  • Checked by hand: Not yet

Open the source

People to call about it (0)

No one listed for this company yet.

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this signal

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Other signals from Lessowby Ports (3)

    Each one opens the same way.

    1. 29/09/2026State budget paperSets the rank

      Funded a project in its capital program

      The budget includes funding for Lessowby Ports to deliver the Breakwater Renewal.

      The project is funded. Design has to be let before it can be built.

      Open the source
    2. 28/08/2026State budget paperSets the rank

      Designs in house

      Design of the Breakwater Renewal will be delivered by Lessowby Ports's own engineering team.

      They design most of their work in house, so less of it goes out.

      Open the source

    Also on record (1)

    Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.

    1. 11/06/2026Tender notice

      Had a studies or advisory tender open

      Quotations are sought from engineering consultants for a feasibility and options study for the Breakwater Renewal.

      They're buying the studies that come before design. The firm that does them is well placed for the design.

      Open the source

    Prepared by Evidential for Vessick Partners, a synthetic seller. List of 12/10/2026.