Asked what studies an approval needs
The signal
Their words
Pillowbrae Water has requested assessment requirements for the Southern Trunk Main Duplication.
Why it matters
They've asked what the assessment needs. Those studies have to be commissioned before they can lodge.
Where it comes from
- Source: Major projects register
- Document date: 15/05/2026
- Sets the company's rank: No
- Checked by hand: Not yet
Pillowbrae Water
- 02/10/2026Had a design tender open
Tenders are invited for detailed civil and structural design of the Southern Trunk Main Duplication, closing 30/10/2026.
Suggested first step They design in house. Ask which packages they send out. The tender is open, so get the documents and check the closing date.
People to call about it (2)
Who to speak to at Pillowbrae Water, decision maker first.
Decision maker
Ingrid Oyelaran
Director Infrastructure
- i•••••
@pi•••••.com.au Verified - Where we found them
- Company announcementChecked 07/10/2026
Daily user
Grace Pearce
Project Manager
- g•••••
@pi•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 05/10/2026
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this signal
Other signals from Pillowbrae Water (2)
Each one opens the same way.
Had a design tender open
Tenders are invited for detailed civil and structural design of the Southern Trunk Main Duplication, closing 30/10/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceDesigns in house
Design of the Southern Trunk Main Duplication will be delivered by Pillowbrae Water's own engineering team.
They design most of their work in house, so less of it goes out.