Vessick Partners

The signal

Their words

Tessaby Energy awarded a contract for geotechnical investigation and survey for the Wind Farm Connection, valued at $310,000.

Why it matters

Survey or geotechnical work has been let. Design usually comes next.

Where it comes from

  • Source: Contract award notice
  • Document date: 28/05/2026
  • Sets the company's rank: No
  • Checked by hand: Not yet

Open the source

People to call about it (0)

No one listed for this company yet.

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this signal

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Other signals from Tessaby Energy (2)

    Each one opens the same way.

    1. 11/09/2026State budget paperSets the rank

      Funded a project in its capital program

      The budget includes funding for Tessaby Energy to deliver the Wind Farm Connection.

      The project is funded. Design has to be let before it can be built.

      Open the source
    2. 11/06/2026State budget paperSets the rank

      Designs in house

      Design of the Wind Farm Connection will be delivered by Tessaby Energy's own engineering team.

      They design most of their work in house, so less of it goes out.

      Open the source

    Prepared by Evidential for Vessick Partners, a synthetic seller. List of 12/10/2026.