Tarrow Plant Hire

The brief

Why now

  • 24/09/2026Had a major project approvedThe Ellenbin Bridge Replacement, proposed by Emmabar Infrastructure, has been approved with conditions.
  • 29/12/2025Named earthmoving plant for the jobThe construction management plan lists excavators, dozers, rollers and water carts for the bulk earthworks.

Who to speak to

Hamish Mwangi, Project Manager Decision maker

Suggested first step
The plan names earthmoving plant. Lead with your excavators and rollers and ask for the project manager. The start date isn't set yet, so get onto their supplier list before the plant is tendered.

Plant named

Earthmoving

Good to know

  • Latest signal: 24/09/2026
  • Signals on record: 4
  • Sites starting in 90 days: 0
  • Checked by hand: Partly
  • Your customer: No

Signals (4)

Each signal comes from a document, with the sentence behind it. Open one to see it with the people to call.

  1. 24/09/2026Major project approvalSets the rank

    Had a major project approved

    The Ellenbin Bridge Replacement, proposed by Emmabar Infrastructure, has been approved with conditions.

    The project has its approval, so construction is next. Get in before the plant is tendered.

    Open the source
  2. 29/12/2025Development approvalSets the rank

    Named earthmoving plant for the job

    The construction management plan lists excavators, dozers, rollers and water carts for the bulk earthworks.

    The plan names excavators, dozers and rollers. That's the fleet you hire out.

    Open the source

Also on record (2)

Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.

  1. 11/05/2026Government contract award

    Was added to a works panel

    Emmabar Infrastructure has been appointed to the Northern Territory road maintenance panel for a term of 3 years.

    They're on a government works panel, so jobs will come through it. Get onto their supplier list early.

    Open the source
  2. 02/03/2026Major project approval

    Referred a project for environmental approval

    Emmabar Infrastructure has referred the Ellenbin Bridge Replacement for assessment, with construction proposed over 43 months.

    An early sign. The project is in assessment, so the build is likely a year or more away.

    Open the source

People (1)

Who to speak to at Emmabar Infrastructure, decision maker first.

  • Decision maker

    Hamish Mwangi

    Project Manager

    Email
    Verified
    Where we found them
    LinkedIn profileChecked 03/10/2026

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this company

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Prepared by Evidential for Tarrow Plant Hire, a synthetic seller. List of 12/10/2026.