Tarrow Plant Hire

The signal

Their words

Emmabar Infrastructure has been appointed to the Northern Territory road maintenance panel for a term of 3 years.

Why it matters

They're on a government works panel, so jobs will come through it. Get onto their supplier list early.

Where it comes from

  • Source: Government contract award
  • Document date: 11/05/2026
  • Sets the company's rank: No
  • Checked by hand: Not yet

Open the source

People to call about it (1)

Who to speak to at Emmabar Infrastructure, decision maker first.

  • Decision maker

    Hamish Mwangi

    Project Manager

    Email
    Verified
    Where we found them
    LinkedIn profileChecked 03/10/2026

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this signal

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Other signals from Emmabar Infrastructure (3)

    Each one opens the same way.

    1. 24/09/2026Major project approvalSets the rank

      Had a major project approved

      The Ellenbin Bridge Replacement, proposed by Emmabar Infrastructure, has been approved with conditions.

      The project has its approval, so construction is next. Get in before the plant is tendered.

      Open the source
    2. 29/12/2025Development approvalSets the rank

      Named earthmoving plant for the job

      The construction management plan lists excavators, dozers, rollers and water carts for the bulk earthworks.

      The plan names excavators, dozers and rollers. That's the fleet you hire out.

      Open the source

    Also on record (1)

    Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.

    1. 02/03/2026Major project approval

      Referred a project for environmental approval

      Emmabar Infrastructure has referred the Ellenbin Bridge Replacement for assessment, with construction proposed over 43 months.

      An early sign. The project is in assessment, so the build is likely a year or more away.

      Open the source

    Prepared by Evidential for Tarrow Plant Hire, a synthetic seller. List of 12/10/2026.