Referred a project for environmental approval
The signal
Their words
Emmabar Infrastructure has referred the Ellenbin Bridge Replacement for assessment, with construction proposed over 43 months.
Why it matters
An early sign. The project is in assessment, so the build is likely a year or more away.
Where it comes from
- Source: Major project approval
- Document date: 02/03/2026
- Sets the company's rank: No
- Checked by hand: Not yet
Emmabar Infrastructure
- 24/09/2026Had a major project approved
The Ellenbin Bridge Replacement, proposed by Emmabar Infrastructure, has been approved with conditions.
- 29/12/2025Named earthmoving plant for the job
The construction management plan lists excavators, dozers, rollers and water carts for the bulk earthworks.
Suggested first step The plan names earthmoving plant. Lead with your excavators and rollers and ask for the project manager. The start date isn't set yet, so get onto their supplier list before the plant is tendered.
People to call about it (1)
Who to speak to at Emmabar Infrastructure, decision maker first.
Decision maker
Hamish Mwangi
Project Manager
- h•••••
@em•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 03/10/2026
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this signal
Other signals from Emmabar Infrastructure (3)
Each one opens the same way.
Had a major project approved
The Ellenbin Bridge Replacement, proposed by Emmabar Infrastructure, has been approved with conditions.
The project has its approval, so construction is next. Get in before the plant is tendered.
Open the sourceNamed earthmoving plant for the job
The construction management plan lists excavators, dozers, rollers and water carts for the bulk earthworks.
The plan names excavators, dozers and rollers. That's the fleet you hire out.
Open the source
Also on record (1)
Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.
Was added to a works panel
Emmabar Infrastructure has been appointed to the Northern Territory road maintenance panel for a term of 3 years.
They're on a government works panel, so jobs will come through it. Get onto their supplier list early.
Open the source