  • 02/10/2026Funded a mine expansionFunding is in place for the Garrimbee Downs expansion, including a second ball mill and a larger crushing circuit.
  • 06/07/2026Was building new site powerA 49 megawatt hybrid power station is being built at Garrimbee Downs to cut diesel use.

Who to speak to

Sofia Tanaka, Maintenance Manager Decision maker

Suggested first step
Their plant or fleet is ageing. Lead with repairs and rebuilds. The expansion is going ahead, so ask who is planning the plant, electrical and workshop work.

Maintenance setup

Ageing plant or fleet

Good to know

  • Latest signal: 02/10/2026
  • Signals on record: 6
  • Operating mines: 1
  • Plant throughput: 3.6 million tonnes a year
  • Checked by hand: Yes
  • Your customer: No

Signals (6)

Each signal comes from a document, with the sentence behind it. Open one to see it with the people to call.

  1. 02/10/2026Company announcementSets the rank

    Funded a mine expansion

    Funding is in place for the Garrimbee Downs expansion, including a second ball mill and a larger crushing circuit.

    The money for the expansion is in place, so the work is likely to start soon.

    Open the source
  2. 19/08/2026Company announcementSets the rank

    Runs ageing plant or fleet

    The Garrimbee Downs processing plant has been running since 2002.

    The plant or fleet is getting old. Older machines need more repairs and rebuilds.

    Open the source
  3. 07/08/2026Company announcementSets the rank

    Reported lower plant availability

    Plant availability at Garrimbee Downs fell to 79 per cent in the quarter, below the target of 92 per cent.

    Plant availability is below target, so maintenance is under pressure.

    Open the source
  4. 29/07/2026Development approvalSets the rank

    Had a camp extension approved

    Approval has been granted to extend the Garrimbee Downs accommodation village by 211 rooms.

    More rooms on site means more people coming, usually for a build or a shutdown.

    Open the source
  5. 06/07/2026Company announcementSets the rank

    Was building new site power

    A 49 megawatt hybrid power station is being built at Garrimbee Downs to cut diesel use.

    New site power means new switchgear and cabling to install and look after.

    Open the source

Also on record (1)

Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.

  1. 06/03/2026State tenement and mine register

    Applied for a mining lease

    Hendravin Mining applied for a mining lease of 1,246 hectares adjoining Garrimbee Downs.

    They've applied for a mining lease. It's an early sign of a new pit or plant.

    Open the source

People (2)

Who to speak to at Hendravin Mining, decision maker first.

  • Decision maker

    Sofia Tanaka

    Maintenance Manager

    Email
    Verified
    Where we found them
    Company announcementChecked 06/10/2026
  • Daily user

    Arjun Okafor

    Maintenance Superintendent

    Where we found them
    LinkedIn profileChecked 06/10/2026

Notes (1)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

  • Called Sofia Tanaka. They're short of fitters and electricians for the expansion tie-in. Sending rates by Friday.

    Quinn Harlow11/10/2026
Report a problem with this company

Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

Prepared by Evidential for Shaftwell, a synthetic seller. List of 12/10/2026.