Had a camp extension approved
The signal
Their words
Approval has been granted to extend the Garrimbee Downs accommodation village by 211 rooms.
Why it matters
More rooms on site means more people coming, usually for a build or a shutdown.
Where it comes from
- Source: Development approval
- Document date: 29/07/2026
- Sets the company's rank: Yes
- Checked by hand: Yes
Hendravin Mining
- 02/10/2026Funded a mine expansion
Funding is in place for the Garrimbee Downs expansion, including a second ball mill and a larger crushing circuit.
- 06/07/2026Was building new site power
A 49 megawatt hybrid power station is being built at Garrimbee Downs to cut diesel use.
Suggested first step Their plant or fleet is ageing. Lead with repairs and rebuilds. The expansion is going ahead, so ask who is planning the plant, electrical and workshop work.
People to call about it (2)
Who to speak to at Hendravin Mining, decision maker first.
Decision maker
Sofia Tanaka
Maintenance Manager
- s•••••
@he•••••.com.au Verified - Where we found them
- Company announcementChecked 06/10/2026
Daily user
Arjun Okafor
Maintenance Superintendent
- Where we found them
- LinkedIn profileChecked 06/10/2026
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this signal
Other signals from Hendravin Mining (5)
Each one opens the same way.
Funded a mine expansion
Funding is in place for the Garrimbee Downs expansion, including a second ball mill and a larger crushing circuit.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceRuns ageing plant or fleet
The Garrimbee Downs processing plant has been running since 2002.
The plant or fleet is getting old. Older machines need more repairs and rebuilds.
Open the sourceReported lower plant availability
Plant availability at Garrimbee Downs fell to 79 per cent in the quarter, below the target of 92 per cent.
Plant availability is below target, so maintenance is under pressure.
Open the sourceWas building new site power
A 49 megawatt hybrid power station is being built at Garrimbee Downs to cut diesel use.
New site power means new switchgear and cabling to install and look after.
Open the source
Also on record (1)
Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.
Applied for a mining lease
Hendravin Mining applied for a mining lease of 1,246 hectares adjoining Garrimbee Downs.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source