Vessick Partners

The brief

Why now

  • 07/10/2026Had a design tender openTenders are invited for detailed civil and structural design of the Pump Station Renewal Program, closing 30/10/2026.
  • 28/08/2026Funded a project in its capital programVarrenby Water: Pump Station Renewal Program, estimated total cost $159 million, funded from 2026-27.

Who to speak to

Ethan Jarrett, Director Infrastructure Decision maker

Suggested first step
They design in house. Ask which packages they send out. The tender is open, so get the documents and check the closing date.

Design team

In-house design

Good to know

  • Latest signal: 07/10/2026
  • Signals on record: 6
  • Owner: Water utility
  • Project value: $159 million
  • Checked by hand: Yes
  • Your customer: No

Signals (6)

Each signal comes from a document, with the sentence behind it. Open one to see it with the people to call.

  1. 07/10/2026Tender noticeSets the rank

    Had a design tender open

    Tenders are invited for detailed civil and structural design of the Pump Station Renewal Program, closing 30/10/2026.

    They're buying civil and structural design now. This is the work you sell, and the tender is open.

    Open the source
  2. 28/08/2026State budget paperSets the rank

    Funded a project in its capital program

    Varrenby Water: Pump Station Renewal Program, estimated total cost $159 million, funded from 2026-27.

    The project is funded. Design has to be let before it can be built.

    Open the source
  3. 07/08/2026Contract award noticeSets the rank

    Awarded a site investigation contract

    Varrenby Water awarded a contract for geotechnical investigation and survey for the Pump Station Renewal Program, valued at $360,000.

    Survey or geotechnical work has been let. Design usually comes next.

    Open the source
  4. 11/06/2026State budget paperSets the rank

    Designs in house

    Design of the Pump Station Renewal Program will be delivered by Varrenby Water's own engineering team.

    They design most of their work in house, so less of it goes out.

    Open the source

Also on record (2)

Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.

  1. 03/08/2026Tender notice

    Had a studies or advisory tender open

    Varrenby Water seeks a consultant for geotechnical investigation and concept design of the Pump Station Renewal Program.

    They're buying the studies that come before design. The firm that does them is well placed for the design.

    Open the source
  2. 27/02/2026Contract award notice

    Awarded a site investigation contract

    Varrenby Water awarded a contract for geotechnical investigation and survey for the Pump Station Renewal Program, valued at $190,000.

    Survey or geotechnical work has been let. Design usually comes next.

    Open the source

People (4)

Who to speak to at Varrenby Water, decision maker first.

  • Decision maker

    Ethan Jarrett

    Director Infrastructure

    Email
    Verified
    Where we found them
    Company announcementChecked 04/10/2026
  • Daily user

    Angus Thackeray

    Project Manager

    Email
    Verified, on another domain
    Where we found them
    Company announcementChecked 11/10/2026
  • Sponsor

    Renee Brennan

    Chief Executive Officer

    Email
    Verified
    Where we found them
    Company announcementChecked 11/10/2026
  • Daily user

    Hannah Underhill

    Senior Project Engineer

    Email
    Verified
    Where we found them
    Company announcementChecked 04/10/2026

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this company

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Prepared by Evidential for Vessick Partners, a synthetic seller. List of 12/10/2026.