- Company announcement
- Checked on 11/10/2026
Varrenby Water
- 07/10/2026Had a design tender open
Tenders are invited for detailed civil and structural design of the Pump Station Renewal Program, closing 30/10/2026.
- 28/08/2026Funded a project in its capital program
Varrenby Water: Pump Station Renewal Program, estimated total cost $159 million, funded from 2026-27.
Suggested first step They design in house. Ask which packages they send out. The tender is open, so get the documents and check the closing date.
Signals from Varrenby Water (6)
What the company said, and why each one matters.
Had a design tender open
Tenders are invited for detailed civil and structural design of the Pump Station Renewal Program, closing 30/10/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceFunded a project in its capital program
Varrenby Water: Pump Station Renewal Program, estimated total cost $159 million, funded from 2026-27.
The project is funded. Design has to be let before it can be built.
Open the sourceAwarded a site investigation contract
Varrenby Water awarded a contract for geotechnical investigation and survey for the Pump Station Renewal Program, valued at $360,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the sourceDesigns in house
Design of the Pump Station Renewal Program will be delivered by Varrenby Water's own engineering team.
They design most of their work in house, so less of it goes out.
Open the source
Also on record (2)
Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.
Had a studies or advisory tender open
Varrenby Water seeks a consultant for geotechnical investigation and concept design of the Pump Station Renewal Program.
They're buying the studies that come before design. The firm that does them is well placed for the design.
Open the sourceAwarded a site investigation contract
Varrenby Water awarded a contract for geotechnical investigation and survey for the Pump Station Renewal Program, valued at $190,000.
Survey or geotechnical work has been let. Design usually comes next.
Open the source
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this person
Others at Varrenby Water (3)
Decision maker first.
Decision maker
Ethan Jarrett
Director Infrastructure
- e•••••
@va•••••.com.au Verified - Where we found them
- Company announcementChecked 04/10/2026
Sponsor
Renee Brennan
Chief Executive Officer
- r•••••
@va•••••.com.au Verified - Where we found them
- Company announcementChecked 11/10/2026
Daily user
Hannah Underhill
Senior Project Engineer
- h•••••
@va•••••.com.au Verified - Where we found them
- Company announcementChecked 04/10/2026
Prepared by Evidential for Vessick Partners, a synthetic seller. List of 12/10/2026.