Design of the Wind Farm Connection will be delivered by Wraxendale Power's own engineering team.

Why it matters

They design most of their work in house, so less of it goes out.

Where it comes from

  • Source: State budget paper
  • Document date: 28/05/2026
  • Sets the company's rank: Yes
  • Checked by hand: Yes

Open the source

People to call about it (2)

Who to speak to at Wraxendale Power, decision maker first.

  • Decision maker

    Aisha Sorensen

    Director Infrastructure

    Email
    Verified
    Where we found them
    LinkedIn profileChecked 06/10/2026
  • Daily user

    Owen Carmody

    Project Manager

    Email
    Verified
    Where we found them
    Company announcementChecked 09/10/2026

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this signal

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Other signals from Wraxendale Power (2)

    Each one opens the same way.

    1. 02/10/2026Tender noticeSets the rank

      Had a design tender open

      Wraxendale Power invites submissions from engineering consultants for design services for the Wind Farm Connection. Submissions close 06/11/2026.

      They're buying civil and structural design now. This is the work you sell, and the tender is open.

      Open the source

    Also on record (1)

    Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.

    1. 08/05/2026Contract award notice

      Awarded a site investigation contract

      Wraxendale Power awarded a contract for geotechnical investigation and survey for the Wind Farm Connection, valued at $190,000.

      Survey or geotechnical work has been let. Design usually comes next.