Awarded a site investigation contract
The signal
Their words
Wraxendale Power awarded a contract for geotechnical investigation and survey for the Wind Farm Connection, valued at $190,000.
Why it matters
Survey or geotechnical work has been let. Design usually comes next.
Where it comes from
- Source: Contract award notice
- Document date: 08/05/2026
- Sets the company's rank: No
- Checked by hand: Not yet
Wraxendale Power
- 02/10/2026Had a design tender open
Wraxendale Power invites submissions from engineering consultants for design services for the Wind Farm Connection. Submissions close 06/11/2026.
Suggested first step They design in house. Ask which packages they send out. The tender is open, so get the documents and check the closing date.
People to call about it (2)
Who to speak to at Wraxendale Power, decision maker first.
Decision maker
Aisha Sorensen
Director Infrastructure
- a•••••
@wr•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 06/10/2026
Daily user
Owen Carmody
Project Manager
- o•••••
@wr•••••.com.au Verified - Where we found them
- Company announcementChecked 09/10/2026
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this signal
Other signals from Wraxendale Power (2)
Each one opens the same way.
Had a design tender open
Wraxendale Power invites submissions from engineering consultants for design services for the Wind Farm Connection. Submissions close 06/11/2026.
They're buying civil and structural design now. This is the work you sell, and the tender is open.
Open the sourceDesigns in house
Design of the Wind Farm Connection will be delivered by Wraxendale Power's own engineering team.
They design most of their work in house, so less of it goes out.
Open the source
Prepared by Evidential for Vessick Partners, a synthetic seller. List of 12/10/2026.