Signals
Everything the companies on the list said that we picked up. Each signal is quoted, dated and linked. Open one to see why it matters and who to call.
All signals
No signals match. Clear the filters
Funded a mine expansion
Funding is in place for the Garrimbee Downs expansion, including a second ball mill and a larger crushing circuit.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceRuns ageing plant or fleet
The Garrimbee Downs processing plant has been running since 2002.
The plant or fleet is getting old. Older machines need more repairs and rebuilds.
Open the sourceReported lower plant availability
Plant availability at Garrimbee Downs fell to 79 per cent in the quarter, below the target of 92 per cent.
Plant availability is below target, so maintenance is under pressure.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Garrimbee Downs accommodation village by 211 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceWas building new site power
A 49 megawatt hybrid power station is being built at Garrimbee Downs to cut diesel use.
New site power means new switchgear and cabling to install and look after.
Open the sourceApplied for a mining lease
Hendravin Mining applied for a mining lease of 1,246 hectares adjoining Garrimbee Downs.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Approved a mine expansion
The board has approved the Tunnaby Well expansion, adding a second crushing line.
The board has said yes to more plant. Contracts for the build and its upkeep follow.
Open the sourceReported unplanned plant downtime
Mill throughput was lower in the quarter after an unplanned primary crusher outage at Tunnaby Well.
Unplanned downtime means repairs are needed, and fast. Reliability is on their mind.
Open the sourceScheduled a major plant shutdown
A 12 day major shutdown of the Tunnaby Well processing plant is scheduled for December.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the sourceMaintains plant with its own crew
Plant maintenance at Tunnaby Well is carried out by the site's own maintenance team.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the sourceWas upgrading its plant
A new thickener circuit is being installed at the Tunnaby Well plant.
Plant is being upgraded now. Installing, wiring and commissioning it all need extra hands.
Open the sourceApplied for a mining lease
Lorrandee Minerals applied for a mining lease of 1,368 hectares adjoining Tunnaby Well.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Funded a mine expansion
Funding is in place for the Rombardee Flat expansion, including a second ball mill and a larger crushing circuit.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceWas adding to its mining fleet
Delivery of 12 new haul trucks to Rombardee Flat is expected in January.
New fleet is on the way. It will need workshop space, servicing and electrical work.
Open the sourceContracts out maintenance work
Shutdown and major maintenance work at Rombardee Flat is contracted out.
They contract out maintenance work, so there's work to bid for.
Open the sourceScheduled a major plant shutdown
A 7 day major shutdown of the Rombardee Flat processing plant is scheduled for December.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the source
Funded a mine expansion
A $142 million debt facility has been signed to fund the Glendarrow Hill expansion, with first works this quarter.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceWas upgrading its plant
Mirrandock Mining is upgrading the crushing and screening circuit at Glendarrow Hill, with work due to finish in December.
Plant is being upgraded now. Installing, wiring and commissioning it all need extra hands.
Open the sourceRuns ageing plant or fleet
The Glendarrow Hill processing plant has been running since 1991.
The plant or fleet is getting old. Older machines need more repairs and rebuilds.
Open the sourceWas upgrading its plant
Mirrandock Mining is upgrading the crushing and screening circuit at Glendarrow Hill, with work due to finish in January.
Plant is being upgraded now. Installing, wiring and commissioning it all need extra hands.
Open the sourceScheduled a major plant shutdown
An 8 day major shutdown of the Glendarrow Hill processing plant is scheduled for November.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the source
Funded a mine expansion
Funding is in place for the Jessavale Well expansion, including a second ball mill and a larger crushing circuit.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceContracts out maintenance work
Shutdown and major maintenance work at Jessavale Well is contracted out.
They contract out maintenance work, so there's work to bid for.
Open the sourceScheduled a major plant shutdown
A 12 day major shutdown of the Jessavale Well processing plant is scheduled for December.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the sourceWas upgrading its plant
A new thickener circuit is being installed at the Jessavale Well plant.
Plant is being upgraded now. Installing, wiring and commissioning it all need extra hands.
Open the source
Funded a mine expansion
Funding is in place for the Ordenvale Creek expansion, including a second ball mill and a larger crushing circuit.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceHad a workshop approved
Approval has been granted for a heavy vehicle workshop and warehouse at the Ordenvale Creek site.
A new workshop is approved. It will need fit-out, power and equipment.
Open the sourceHad a mining lease granted
A mining lease covering the Ordenvale Creek mine was granted to Wirrangle Resources.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceReported lower plant availability
Plant availability at Ordenvale Creek fell to 82 per cent in the quarter, below the target of 92 per cent.
Plant availability is below target, so maintenance is under pressure.
Open the sourceScheduled a major plant shutdown
A 13 day major shutdown of the Ordenvale Creek processing plant is scheduled for December.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the source
Won a mining contract on an expansion
Velgarrie Mining Services has been awarded a seven year mining services contract for the Larrikoo Well expansion.
They've won more work on a growing site. Their fleet and workshop will need more support.
Open the sourceWas adding to its mining fleet
Delivery of 4 new haul trucks to Larrikoo Well is expected in January.
New fleet is on the way. It will need workshop space, servicing and electrical work.
Open the sourceMaintains plant with its own crew
Fleet maintenance is done by the company's own workshop crews on each site.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the sourceWas upgrading its plant
A new leach circuit is being installed at the Larrikoo Well plant.
Plant is being upgraded now. Installing, wiring and commissioning it all need extra hands.
Open the sourceScheduled a major plant shutdown
A 17 day major shutdown of the Larrikoo Well processing plant is scheduled for November.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the source
Was building new site power
A 49 megawatt hybrid power station is being built at Wantabrie Gap to cut diesel use.
New site power means new switchgear and cabling to install and look after.
Open the sourceHad a workshop approved
Approval has been granted for a heavy vehicle workshop and warehouse at the Wantabrie Gap site.
A new workshop is approved. It will need fit-out, power and equipment.
Open the sourceHad a mine expansion approved
Approval has been granted to expand the Wantabrie Gap mine and lift ore processing to 4.9 million tonnes a year.
The regulator has approved the expansion, so the build can start.
Open the sourceRuns ageing plant or fleet
The Wantabrie Gap processing plant has been running since 1996.
The plant or fleet is getting old. Older machines need more repairs and rebuilds.
Open the source
Approved a mine expansion
The board has approved the Ellendara Flat expansion, adding a new leach circuit.
The board has said yes to more plant. Contracts for the build and its upkeep follow.
Open the sourceReported unplanned plant downtime
Mill throughput was lower in the quarter after an unplanned primary crusher outage at Ellendara Flat.
Unplanned downtime means repairs are needed, and fast. Reliability is on their mind.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Ellendara Flat accommodation village by 194 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceApplied for a mining lease
Eskaval Metals applied for a mining lease of 437 hectares adjoining Ellendara Flat.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Had a mine expansion approved
Approval has been granted to expand the Rombardee Flat mine and lift ore processing to 6.2 million tonnes a year.
The regulator has approved the expansion, so the build can start.
Open the sourceWas building new site power
A 54 megawatt hybrid power station is being built at Rombardee Flat to cut diesel use.
New site power means new switchgear and cabling to install and look after.
Open the sourceRuns ageing plant or fleet
The Rombardee Flat processing plant has been running since 2000.
The plant or fleet is getting old. Older machines need more repairs and rebuilds.
Open the source
Funded a mine expansion
The $67 million expansion of the Larrikoo Well plant is fully funded from cash and a new debt facility.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceRegistered a new mine site
A new mine site at Larrikoo Well was registered to Holvenby Metals, with open pit mining recorded.
A new mine site is on the register, so work on the ground is close.
Open the sourceMaintains plant with its own crew
Plant maintenance at Larrikoo Well is carried out by the site's own maintenance team.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the sourceWas upgrading its plant
A new conveyor circuit is being installed at the Larrikoo Well plant.
Plant is being upgraded now. Installing, wiring and commissioning it all need extra hands.
Open the sourceScheduled a major plant shutdown
A 13 day major shutdown of the Larrikoo Well processing plant is scheduled for November.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the source
Had a mining lease granted
A mining lease covering the Quarrawin Creek mine was granted to Arvendel Minerals.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceFunded a mine expansion
A $103 million debt facility has been signed to fund the Quarrawin Creek expansion, with first works this quarter.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceScheduled a major plant shutdown
A 10 day major shutdown of the Quarrawin Creek processing plant is scheduled for January.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the sourceRuns ageing plant or fleet
The Quarrawin Creek processing plant has been running since 1999.
The plant or fleet is getting old. Older machines need more repairs and rebuilds.
Open the sourceScheduled a major plant shutdown
A 9 day major shutdown of the Quarrawin Creek processing plant is scheduled for December.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the source
Won a mining contract on an expansion
Wilgarran Mining Services has been awarded a seven year mining services contract for the Varramoor Flat expansion.
They've won more work on a growing site. Their fleet and workshop will need more support.
Open the sourceMaintains plant with its own crew
Fleet maintenance is done by the company's own workshop crews on each site.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the source
Won a mining contract on an expansion
Corrandel Mining Services has been awarded a five year mining services contract for the Jessavale Well expansion.
They've won more work on a growing site. Their fleet and workshop will need more support.
Open the sourceWas adding to its mining fleet
Delivery of 5 new haul trucks to Jessavale Well is expected in December.
New fleet is on the way. It will need workshop space, servicing and electrical work.
Open the source
Won added scope at a mine
Sorrabend Contracting will add 5 haul trucks and two excavators to its fleet at Tunnaby Well under an expanded contract.
More fleet on site means more machines to repair and keep running.
Open the sourceRuns ageing plant or fleet
Much of the haul fleet is more than ten years old.
The plant or fleet is getting old. Older machines need more repairs and rebuilds.
Open the sourceScheduled a major plant shutdown
A 14 day major shutdown of the Tunnaby Well processing plant is scheduled for November.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the source
Approved a mine expansion
The board has approved the Treganna Creek expansion, adding a new leach circuit.
The board has said yes to more plant. Contracts for the build and its upkeep follow.
Open the sourceScheduled a major plant shutdown
A 10 day major shutdown of the Treganna Creek processing plant is scheduled for December.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the sourceApplied for a mining lease
Jalbarrow Metals applied for a mining lease of 358 hectares adjoining Treganna Creek.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Reported unplanned plant downtime
Mill throughput was lower in the quarter after an unplanned ball mill outage at Malvoran Flat.
Unplanned downtime means repairs are needed, and fast. Reliability is on their mind.
Open the sourceFunded a mine expansion
A $168 million debt facility has been signed to fund the Malvoran Flat expansion, with first works this quarter.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Malvoran Flat accommodation village by 282 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceContracts out maintenance work
Shutdown and major maintenance work at Malvoran Flat is contracted out.
They contract out maintenance work, so there's work to bid for.
Open the sourceApplied for a mining lease
Barvellin Mining applied for a mining lease of 1,807 hectares adjoining Malvoran Flat.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Was adding to its mining fleet
Delivery of 8 new haul trucks to Ellendara Flat is expected in December.
New fleet is on the way. It will need workshop space, servicing and electrical work.
Open the sourceWon a mining contract on an expansion
Kildrennan Civil and Mining has been awarded a four year mining services contract for the Ellendara Flat expansion.
They've won more work on a growing site. Their fleet and workshop will need more support.
Open the sourceApplied for a mining lease
Kildrennan Civil and Mining applied for a mining lease of 843 hectares adjoining Ellendara Flat.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Was adding to its mining fleet
Delivery of 4 new haul trucks to Kindabeel Gap is expected in December.
New fleet is on the way. It will need workshop space, servicing and electrical work.
Open the sourceWon a mining contract on an expansion
Gantermoor Civil and Mining has been awarded a five year mining services contract for the Kindabeel Gap expansion.
They've won more work on a growing site. Their fleet and workshop will need more support.
Open the sourceMaintains plant with its own crew
Fleet maintenance is done by the company's own workshop crews on each site.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the sourceApplied for a mining lease
Gantermoor Civil and Mining applied for a mining lease of 1,780 hectares adjoining Kindabeel Gap.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the sourceWas upgrading its plant
A new conveyor circuit is being installed at the Kindabeel Gap plant.
Plant is being upgraded now. Installing, wiring and commissioning it all need extra hands.
Open the source
Funded a mine expansion
A $137 million debt facility has been signed to fund the Durrawen Creek expansion, with first works this quarter.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Durrawen Creek accommodation village by 243 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceRuns ageing plant or fleet
The Durrawen Creek processing plant has been running since 1992.
The plant or fleet is getting old. Older machines need more repairs and rebuilds.
Open the sourceApplied for a mining lease
Parvendell Metals applied for a mining lease of 968 hectares adjoining Durrawen Creek.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Funded a mine expansion
The $50 million expansion of the Tibberlee Downs plant is fully funded from cash and a new debt facility.
The money for the expansion is in place, so the work is likely to start soon.
Open the sourceHas a long-term maintenance contract
Maintenance at Tibberlee Downs is provided under a long-term services contract.
A maintenance contractor is already in place. It lowers them on the list but doesn't remove them.
Open the sourceWas upgrading its plant
Rosvanna Resources is upgrading the crushing and screening circuit at Tibberlee Downs, with work due to finish in January.
Plant is being upgraded now. Installing, wiring and commissioning it all need extra hands.
Open the sourceApplied for a mining lease
Rosvanna Resources applied for a mining lease of 566 hectares adjoining Tibberlee Downs.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Approved a mine expansion
The board has approved the Malvoran Flat expansion, adding a larger ball mill.
The board has said yes to more plant. Contracts for the build and its upkeep follow.
Open the sourceHas a long-term maintenance contract
Maintenance at Malvoran Flat is provided under a long-term services contract.
A maintenance contractor is already in place. It lowers them on the list but doesn't remove them.
Open the sourceScheduled a major plant shutdown
A 19 day major shutdown of the Malvoran Flat processing plant is scheduled for November.
A major shutdown needs crews, parts and rebuilds lined up weeks ahead.
Open the source
Made a final investment decision to build
The board has made a final investment decision to build the Pelmorra Hill mine, with first ore expected in 2027.
The build is going ahead. The plant will need installing, wiring and then maintaining.
Open the sourceContracts out maintenance work
Plant maintenance at Pelmorra Hill will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Pelmorra Hill accommodation village by 256 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceHad a mining lease granted
A mining lease covering the Pelmorra Hill project was granted to Dellagrave Resources.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceHad its project approved
Environmental approval has been granted for the Pelmorra Hill mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceApplied for a mining lease
Dellagrave Resources applied for a mining lease of 1,121 hectares adjoining Pelmorra Hill.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Made a final investment decision to build
The board has made a final investment decision to build the Ondaburra Well mine, with first ore expected in 2027.
The build is going ahead. The plant will need installing, wiring and then maintaining.
Open the sourceHad its project approved
Environmental approval has been granted for the Ondaburra Well mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceRegistered a new mine site
A new mine site at Ondaburra Well was registered to Kelvarran Resources, with underground mining recorded.
A new mine site is on the register, so work on the ground is close.
Open the sourceMaintains plant with its own crew
The company plans to run the Ondaburra Well plant with its own maintenance team.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the source
Made a final investment decision to build
The board has made a final investment decision to build the Corranbee Hill mine, with first ore expected in 2027.
The build is going ahead. The plant will need installing, wiring and then maintaining.
Open the sourceHad a mining lease granted
A mining lease covering the Corranbee Hill project was granted to Halcombie Minerals.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceHad its project approved
Environmental approval has been granted for the Corranbee Hill mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceContracts out maintenance work
Plant maintenance at Corranbee Hill will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceApplied for a mining lease
Halcombie Minerals applied for a mining lease of 1,730 hectares adjoining Corranbee Hill.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Awarded the plant construction contract
The contract to design and build the Morrabine Hill processing plant has been awarded, with work to start in November.
The plant builder is chosen. Electrical, commissioning and maintenance work is let next.
Open the sourceHad its project approved
Environmental approval has been granted for the Morrabine Hill mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceHad a processing plant approved
Development approval has been granted for a 3.3 million tonne a year processing plant at Morrabine Hill.
A processing plant is approved. It will need building, wiring and keeping running.
Open the sourceContracts out maintenance work
Plant maintenance at Morrabine Hill will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceReferred a project for approval
Fennagorm Mining has referred the Morrabine Hill project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Made a final investment decision to build
The board has made a final investment decision to build the Pelmorra Hill mine, with first ore expected in 2027.
The build is going ahead. The plant will need installing, wiring and then maintaining.
Open the sourceHad its project approved with conditions
The Pelmorra Hill project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceContracts out maintenance work
Plant maintenance at Pelmorra Hill will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceApplied for a mining lease
Fenmorrow Mining applied for a mining lease of 352 hectares adjoining Pelmorra Hill.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Had a camp extension approved
Approval has been granted to extend the Ambrekin Hill accommodation village by 97 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceSecured the money to build
Project finance of $188 million has been secured to build the Ambrekin Hill processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceRegistered a new mine site
A new mine site at Ambrekin Hill was registered to Ivendar Minerals, with open pit mining recorded.
A new mine site is on the register, so work on the ground is close.
Open the sourceHad its project approved
Environmental approval has been granted for the Ambrekin Hill mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceContracts out maintenance work
Plant maintenance at Ambrekin Hill will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceApplied for a mining lease
Ivendar Minerals applied for a mining lease of 2,339 hectares adjoining Ambrekin Hill.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Had its project approved
Environmental approval has been granted for the Muldarra Ridge mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceSecured the money to build
Project finance of $74 million has been secured to build the Muldarra Ridge processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad a mining lease granted
A mining lease covering the Muldarra Ridge project was granted to Dalgarvie Minerals.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceContracts out maintenance work
Plant maintenance at Muldarra Ridge will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceReferred a project for approval
Dalgarvie Minerals has referred the Muldarra Ridge project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Started early works
Early works have started at Nethercoo Gap, including site clearing, the camp and the access road.
Work has started on site. The main build and its support contracts come next.
Open the sourceHad a processing plant approved
Development approval has been granted for a 0.8 million tonne a year processing plant at Nethercoo Gap.
A processing plant is approved. It will need building, wiring and keeping running.
Open the sourceHad its project approved with conditions
The Nethercoo Gap project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceHad a mining lease granted
A mining lease covering the Nethercoo Gap project was granted to Coldarrow Resources.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceMaintains plant with its own crew
The company plans to run the Nethercoo Gap plant with its own maintenance team.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the sourceReferred a project for approval
Coldarrow Resources has referred the Nethercoo Gap project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Registered a new mine site
A new mine site at Silvaroo Ridge was registered to Rillagorn Mining, with open pit mining recorded.
A new mine site is on the register, so work on the ground is close.
Open the sourceAwarded the plant construction contract
The contract to design and build the Silvaroo Ridge processing plant has been awarded, with work to start in November.
The plant builder is chosen. Electrical, commissioning and maintenance work is let next.
Open the sourceContracts out maintenance work
Plant maintenance at Silvaroo Ridge will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceHad a workshop approved
Approval has been granted for a heavy vehicle workshop and warehouse at the Silvaroo Ridge site.
A new workshop is approved. It will need fit-out, power and equipment.
Open the sourceHad its project approved
Environmental approval has been granted for the Silvaroo Ridge mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceApplied for a mining lease
Rillagorn Mining applied for a mining lease of 1,504 hectares adjoining Silvaroo Ridge.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Awarded the plant construction contract
The contract to design and build the Ordenvale Creek processing plant has been awarded, with work to start in December.
The plant builder is chosen. Electrical, commissioning and maintenance work is let next.
Open the sourceHad a processing plant approved
Development approval has been granted for a 4.7 million tonne a year processing plant at Ordenvale Creek.
A processing plant is approved. It will need building, wiring and keeping running.
Open the sourceHad a mining lease granted
A mining lease covering the Ordenvale Creek project was granted to Talgarnie Metals.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceHad its project approved
Environmental approval has been granted for the Ordenvale Creek mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceContracts out maintenance work
Plant maintenance at Ordenvale Creek will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceReferred a project for approval
Talgarnie Metals has referred the Ordenvale Creek project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Had a workshop approved
Approval has been granted for a heavy vehicle workshop and warehouse at the Bennaroth Range site.
A new workshop is approved. It will need fit-out, power and equipment.
Open the sourceAwarded the plant construction contract
The contract to design and build the Bennaroth Range processing plant has been awarded, with work to start in November.
The plant builder is chosen. Electrical, commissioning and maintenance work is let next.
Open the sourceContracts out maintenance work
Plant maintenance at Bennaroth Range will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceHad its project approved
Environmental approval has been granted for the Bennaroth Range mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceReferred a project for approval
Iskarra Mining has referred the Bennaroth Range project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the sourceApplied for a mining lease
Iskarra Mining applied for a mining lease of 1,226 hectares adjoining Bennaroth Range.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Secured the money to build
Project finance of $386 million has been secured to build the Glendarrow Hill processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad a mining lease granted
A mining lease covering the Glendarrow Hill project was granted to Lomavar Mining.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceHad its project approved
Environmental approval has been granted for the Glendarrow Hill mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceContracts out maintenance work
Plant maintenance at Glendarrow Hill will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the source
Awarded the plant construction contract
The contract to design and build the Simmeroo Creek processing plant has been awarded, with work to start in January.
The plant builder is chosen. Electrical, commissioning and maintenance work is let next.
Open the sourceHad its project approved
Environmental approval has been granted for the Simmeroo Creek mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Simmeroo Creek accommodation village by 93 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceContracts out maintenance work
Plant maintenance at Simmeroo Creek will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceReferred a project for approval
Gorrandine Metals has referred the Simmeroo Creek project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Secured the money to build
Project finance of $337 million has been secured to build the Nethercoo Gap processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad a processing plant approved
Development approval has been granted for a 2.4 million tonne a year processing plant at Nethercoo Gap.
A processing plant is approved. It will need building, wiring and keeping running.
Open the sourceHad its project approved
Environmental approval has been granted for the Nethercoo Gap mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceContracts out maintenance work
Plant maintenance at Nethercoo Gap will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the sourceReferred a project for approval
Belgarrin Metals has referred the Nethercoo Gap project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the sourceApplied for a mining lease
Belgarrin Metals applied for a mining lease of 712 hectares adjoining Nethercoo Gap.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Awarded the plant construction contract
The contract to design and build the Wantabrie Gap processing plant has been awarded, with work to start in January.
The plant builder is chosen. Electrical, commissioning and maintenance work is let next.
Open the sourceHad its project approved
Environmental approval has been granted for the Wantabrie Gap mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceHad a processing plant approved
Development approval has been granted for a 5.7 million tonne a year processing plant at Wantabrie Gap.
A processing plant is approved. It will need building, wiring and keeping running.
Open the sourceMaintains plant with its own crew
The company plans to run the Wantabrie Gap plant with its own maintenance team.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the source
Made a final investment decision to build
The board has made a final investment decision to build the Belloran Gap mine, with first ore expected in 2027.
The build is going ahead. The plant will need installing, wiring and then maintaining.
Open the sourceHad its project approved
Environmental approval has been granted for the Belloran Gap mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceReferred a project for approval
Elgarrow Minerals has referred the Belloran Gap project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the sourceApplied for a mining lease
Elgarrow Minerals applied for a mining lease of 223 hectares adjoining Belloran Gap.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Made a final investment decision to build
The board has made a final investment decision to build the Garrimbee Downs mine, with first ore expected in 2027.
The build is going ahead. The plant will need installing, wiring and then maintaining.
Open the sourceHad its project approved
Environmental approval has been granted for the Garrimbee Downs mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceApplied for a mining lease
Marvellin Resources applied for a mining lease of 1,254 hectares adjoining Garrimbee Downs.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the sourceReferred a project for approval
Marvellin Resources has referred the Garrimbee Downs project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Started early works
Early works have started at Bulgarrow Range, including site clearing, the camp and the access road.
Work has started on site. The main build and its support contracts come next.
Open the sourceHad its project approved
Environmental approval has been granted for the Bulgarrow Range mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceContracts out maintenance work
Plant maintenance at Bulgarrow Range will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the source
Secured the money to build
Project finance of $123 million has been secured to build the Fyndalee Range processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad its project approved with conditions
The Fyndalee Range project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceMaintains plant with its own crew
The company plans to run the Fyndalee Range plant with its own maintenance team.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the source
Awarded the plant construction contract
The contract to design and build the Bennaroth Range processing plant has been awarded, with work to start in December.
The plant builder is chosen. Electrical, commissioning and maintenance work is let next.
Open the sourceHad its project approved
Environmental approval has been granted for the Bennaroth Range mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceHad a processing plant approved
Development approval has been granted for a 1.6 million tonne a year processing plant at Bennaroth Range.
A processing plant is approved. It will need building, wiring and keeping running.
Open the sourceApplied for a mining lease
Cavendrie Metals applied for a mining lease of 1,367 hectares adjoining Bennaroth Range.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Secured the money to build
Project finance of $264 million has been secured to build the Kallaroth Downs processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad its project approved
Environmental approval has been granted for the Kallaroth Downs mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceApplied for a mining lease
Vermoral Metals applied for a mining lease of 349 hectares adjoining Kallaroth Downs.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the sourceReferred a project for approval
Vermoral Metals has referred the Kallaroth Downs project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Secured the money to build
Project finance of $407 million has been secured to build the Muldarra Ridge processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Muldarra Ridge accommodation village by 223 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceHad its project approved
Environmental approval has been granted for the Muldarra Ridge mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceReferred a project for approval
Ulvarrin Metals has referred the Muldarra Ridge project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Secured the money to build
Project finance of $191 million has been secured to build the Varramoor Flat processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Varramoor Flat accommodation village by 202 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceHad its project approved with conditions
The Varramoor Flat project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceApplied for a mining lease
Nambroch Minerals applied for a mining lease of 1,144 hectares adjoining Varramoor Flat.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the sourceReferred a project for approval
Nambroch Minerals has referred the Varramoor Flat project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Yennavale Minerals
Priority twoHad its project approved
Environmental approval has been granted for the Quarrawin Creek mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Quarrawin Creek accommodation village by 191 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceStarted early works
Early works have started at Quarrawin Creek, including site clearing, the camp and the access road.
Work has started on site. The main build and its support contracts come next.
Open the sourceContracts out maintenance work
Plant maintenance at Quarrawin Creek will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the source
Yarvellan Metals
Priority twoStarted early works
Early works have started at Ondaburra Well, including site clearing, the camp and the access road.
Work has started on site. The main build and its support contracts come next.
Open the sourceRegistered a new mine site
A new mine site at Ondaburra Well was registered to Yarvellan Metals, with open pit mining recorded.
A new mine site is on the register, so work on the ground is close.
Open the sourceHad its project approved with conditions
The Ondaburra Well project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceReferred a project for approval
Yarvellan Metals has referred the Ondaburra Well project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Nerrigal Mining
Priority twoHad a mining lease granted
A mining lease covering the Belloran Gap project was granted to Nerrigal Mining.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceSecured the money to build
Project finance of $166 million has been secured to build the Belloran Gap processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad its project approved with conditions
The Belloran Gap project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceMaintains plant with its own crew
The company plans to run the Belloran Gap plant with its own maintenance team.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the sourceReferred a project for approval
Nerrigal Mining has referred the Belloran Gap project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Jennavar Metals
Priority twoHad its project approved
Environmental approval has been granted for the Durrawen Creek mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceHad a workshop approved
Approval has been granted for a heavy vehicle workshop and warehouse at the Durrawen Creek site.
A new workshop is approved. It will need fit-out, power and equipment.
Open the sourceSecured the money to build
Project finance of $132 million has been secured to build the Durrawen Creek processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceReferred a project for approval
Jennavar Metals has referred the Durrawen Creek project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the sourceApplied for a mining lease
Jennavar Metals applied for a mining lease of 1,285 hectares adjoining Durrawen Creek.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Lindavar Minerals
Priority twoAwarded the plant construction contract
The contract to design and build the Tibberlee Downs processing plant has been awarded, with work to start in December.
The plant builder is chosen. Electrical, commissioning and maintenance work is let next.
Open the sourceHad its project approved with conditions
The Tibberlee Downs project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceHad a mining lease granted
A mining lease covering the Tibberlee Downs project was granted to Lindavar Minerals.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceContracts out maintenance work
Plant maintenance at Tibberlee Downs will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the source
Tarvennick Mining
Priority twoHad its project approved
Environmental approval has been granted for the Harrowdene Ridge mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceSecured the money to build
Project finance of $438 million has been secured to build the Harrowdene Ridge processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad a workshop approved
Approval has been granted for a heavy vehicle workshop and warehouse at the Harrowdene Ridge site.
A new workshop is approved. It will need fit-out, power and equipment.
Open the sourceMaintains plant with its own crew
The company plans to run the Harrowdene Ridge plant with its own maintenance team.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the sourceReferred a project for approval
Tarvennick Mining has referred the Harrowdene Ridge project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Fintarrow Resources
Priority twoSecured the money to build
Project finance of $250 million has been secured to build the Bulgarrow Range processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad its project approved
Environmental approval has been granted for the Bulgarrow Range mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceContracts out maintenance work
Plant maintenance at Bulgarrow Range will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the source
Lumbrecourt Metals
Priority twoHad its project approved
Environmental approval has been granted for the Haverin Gap mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceHad a processing plant approved
Development approval has been granted for a 5.4 million tonne a year processing plant at Haverin Gap.
A processing plant is approved. It will need building, wiring and keeping running.
Open the sourceMaintains plant with its own crew
The company plans to run the Haverin Gap plant with its own maintenance team.
They keep maintenance in house. Shutdowns and rebuilds still need extra hands.
Open the sourceApplied for a mining lease
Lumbrecourt Metals applied for a mining lease of 2,377 hectares adjoining Haverin Gap.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the sourceReferred a project for approval
Lumbrecourt Metals has referred the Haverin Gap project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Pelgarrow Minerals
Priority twoSecured the money to build
Project finance of $122 million has been secured to build the Simmeroo Creek processing plant.
The money to build is in place, so construction and its contracts are close.
Open the sourceHad its project approved
Environmental approval has been granted for the Simmeroo Creek mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Simmeroo Creek accommodation village by 128 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceHas a long-term maintenance contract
A maintenance services contract forms part of the Simmeroo Creek construction package.
A maintenance contractor is already in place. It lowers them on the list but doesn't remove them.
Open the sourceApplied for a mining lease
Pelgarrow Minerals applied for a mining lease of 2,167 hectares adjoining Simmeroo Creek.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Zennamar Minerals
Priority twoHad its project approved
Environmental approval has been granted for the Fyndalee Range mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceHad a processing plant approved
Development approval has been granted for a 2.3 million tonne a year processing plant at Fyndalee Range.
A processing plant is approved. It will need building, wiring and keeping running.
Open the sourceApplied for a mining lease
Zennamar Minerals applied for a mining lease of 599 hectares adjoining Fyndalee Range.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Yolvane Metals
Priority twoStarted early works
Early works have started at Harrowdene Ridge, including site clearing, the camp and the access road.
Work has started on site. The main build and its support contracts come next.
Open the sourceHad its project approved with conditions
The Harrowdene Ridge project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceHad a processing plant approved
Development approval has been granted for a 5.4 million tonne a year processing plant at Harrowdene Ridge.
A processing plant is approved. It will need building, wiring and keeping running.
Open the sourceHas a long-term maintenance contract
A maintenance services contract forms part of the Harrowdene Ridge construction package.
A maintenance contractor is already in place. It lowers them on the list but doesn't remove them.
Open the source
Kestrabar Minerals
Priority twoAwarded the plant construction contract
The contract to design and build the Dunvarrow Ridge processing plant has been awarded, with work to start in January.
The plant builder is chosen. Electrical, commissioning and maintenance work is let next.
Open the sourceHad a mining lease granted
A mining lease covering the Dunvarrow Ridge project was granted to Kestrabar Minerals.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceHad its project approved with conditions
The Dunvarrow Ridge project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Dunvarrow Ridge accommodation village by 84 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceHas a long-term maintenance contract
A maintenance services contract forms part of the Dunvarrow Ridge construction package.
A maintenance contractor is already in place. It lowers them on the list but doesn't remove them.
Open the sourceReferred a project for approval
Kestrabar Minerals has referred the Dunvarrow Ridge project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Mervandel Resources
Priority twoStarted early works
Early works have started at Morrabine Hill, including site clearing, the camp and the access road.
Work has started on site. The main build and its support contracts come next.
Open the sourceHad a camp extension approved
Approval has been granted to extend the Morrabine Hill accommodation village by 224 rooms.
More rooms on site means more people coming, usually for a build or a shutdown.
Open the sourceHad its project approved
Environmental approval has been granted for the Morrabine Hill mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceReferred a project for approval
Mervandel Resources has referred the Morrabine Hill project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the sourceApplied for a mining lease
Mervandel Resources applied for a mining lease of 2,280 hectares adjoining Morrabine Hill.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Embrovale Metals
Priority twoMade a final investment decision to build
The board has made a final investment decision to build the Dunvarrow Ridge mine, with first ore expected in 2027.
The build is going ahead. The plant will need installing, wiring and then maintaining.
Open the sourceHad its project approved with conditions
The Dunvarrow Ridge project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceReferred a project for approval
Embrovale Metals has referred the Dunvarrow Ridge project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the sourceApplied for a mining lease
Embrovale Metals applied for a mining lease of 2,317 hectares adjoining Dunvarrow Ridge.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Worrandel Mining
Priority twoHad a workshop approved
Approval has been granted for a heavy vehicle workshop and warehouse at the Ambrekin Hill site.
A new workshop is approved. It will need fit-out, power and equipment.
Open the sourceHad a mining lease granted
A mining lease covering the Ambrekin Hill project was granted to Worrandel Mining.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceHad its project approved
Environmental approval has been granted for the Ambrekin Hill mine and processing plant.
The project is approved, so construction can be planned and funded.
Open the sourceContracts out maintenance work
Plant maintenance at Ambrekin Hill will be contracted out once the plant is commissioned.
They contract out maintenance work, so there's work to bid for.
Open the source
Ostervale Mining
Priority twoHad a processing plant approved
Development approval has been granted for a 5.7 million tonne a year processing plant at Kellandra Ridge.
A processing plant is approved. It will need building, wiring and keeping running.
Open the sourceHad its project approved with conditions
The Kellandra Ridge project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceApplied for a mining lease
Ostervale Mining applied for a mining lease of 1,739 hectares adjoining Kellandra Ridge.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the sourceReferred a project for approval
Ostervale Mining has referred the Kellandra Ridge project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the source
Ingaravel Minerals
Priority twoHad a mining lease granted
A mining lease covering the Silvaroo Ridge project was granted to Ingaravel Minerals.
A mining lease is granted. Mining, and the plant to go with it, can follow.
Open the sourceHad its project approved with conditions
The Silvaroo Ridge project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the source
Hirrandel Mining
Priority twoHad its project approved with conditions
The Kindabeel Gap project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the sourceReferred a project for approval
Hirrandel Mining has referred the Kindabeel Gap project for environmental assessment.
The project is being assessed. It's an early sign of a build to come.
Open the sourceApplied for a mining lease
Hirrandel Mining applied for a mining lease of 1,439 hectares adjoining Kindabeel Gap.
They've applied for a mining lease. It's an early sign of a new pit or plant.
Open the source
Jorvallin Metals
Priority twoHad its project approved with conditions
The Kallaroth Downs project has been approved, subject to conditions on water, dust and rehabilitation.
The project is approved with conditions. Construction can be planned around them.
Open the source
Showing 25 of 275Show 25 more
Prepared by Evidential for Shaftwell, a synthetic seller. List of 12/10/2026.